Paper | Title | Page |
---|---|---|
MPPT017 | Design of Switching Magnet for 20-MeV Beamlines at PEFP | 1575 |
|
||
Funding: Ministry of Science and Technology. The PEFP(Proton Engineering Frontier Project) proton linac is designed to have two proton beam extraction lines at the 20-MeV and 100-MeV end. The 20-MeV extraction line is branched out into 5 beamlines by using the switching magnet. The magnet bends the proton beam by +20, +10, 0, -10, -20 degrees, respectively, and has an AC frequency of 5 Hz with a programmable ac power supply. It employs an H-shape, 0.45 T magnetic field, 0.5 m effective magnet length, 30x5 cm bore aperture. The pole shape is optimized for the field levels. Laminated steel of 0.5 mm is enough to suppress the eddy current effect in the yoke. This paper presents the magnet specification and primary design. |
||
MPPT075 | Analysis and Design of Backing Beam for Multipole Wiggler (MPW14) at PLS | 3940 |
|
||
Pohang Accelerator Laboratory (PAL) had developed and installed a Multipole Wiggler (MPW14) to utilize high energy synchrotron radiation at Pohang Light Source (PLS). The MPW14 is a hybrid type device with period of 14 cm, minimum gap of 14 mm, maximum flux density of 2.02 Tesla and total magnetic structure length of 2056 mm. The support locations and structure of an insertion device are optimized to achieve a minimum deflection due to the magnetic loads. A Finite Element Analysis (FEA) is performed to find out the amount of maximum deflection and optimal support positions on the backing beam, the support and drive structures of the MPW14 under expected magnetic load of 14 tons. To reduce the deflection effect further, two springs are designed and installed to compensate the gap dependent magnetic loads. The optimized deflection is estimated to be about 20.6 ? while the deflection before optimization is 238 ?. | ||
WPAE016 | Development of a Precision Amplifier for the Detector | 1514 |
|
||
A high gain trans-resistance amplfier has been developed for measuring the intensity of synchrotron radiation at Pohang Light Source(PLS). This amplifier built with discrete elements and operational amplifiers.It had the capability of measuring range from 1pA to 1 uA with good linearity. A microprocessor was also installed to interface the amplifier with the computer, and controlled the other sub-circuits. The various characteristics of amplifier such as linearity, sensitivity,stability, etc. have been investigated, and its experimental results carried out at the beam line are presented in this paper. | ||
WPAE060 | Programmable Power Supply for AC Switching Magnet of Proton Accelerator | 3508 |
|
||
Funding: Ministry of Science and Technology. The 100-MeV PEFP proton linac has two proton beam extraction lines for user experiment. Each extraction line has 5 beamlines and has 5 Hz operating frequency. An AC switching magnet is used to distribute the proton beam to the 5 beamlines, An AC switching magnet is powered by PWM-controlled bipolar switching-mode converters. This converter is designed to operate at ±350A, 5 Hz programmable step output. The power supply is employed IGBT module and has controlled by a DSP (Digital Signal Process). This paper describes the design and test results of the power supply. |