A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Henrist, B.

Paper Title Page
RPPE042 Aperture and Field Constraints for the Vacuum System in the LHC Injection Septa 2732
 
  • M. Gyr, B. Henrist, J.M. Jimenez, J.-M. Lacroix, S. Sgobba
    CERN, Geneva
 
  Each beam arriving from the SPS has to pass through five injection septum magnets before being kicked onto the LHC orbit. The injection layout implies that the vacuum chambers for the two circulating beams pass through the septum magnet yokes at a flange distance from the chamber of the beam to be injected. Specially designed vacuum chambers and interconnections provide the required straightness and alignment precision, thus optimising the aperture for both the circulating and injected beams, without affecting the quality of the magnetic dipole field seen by the injected beam. The circulating beams are shielded against the magnetic stray field by using μ-metal chambers with a thickness of 0.9 mm to avoid saturation of the μ-metal (0.8 T), coated with copper (0.4 mm) for impedance reasons and NEG for pumping and electron cloud purposes. A sufficiently large gap between the iron yoke and the μ-metal chamber allows an in-situ bake-out at 200°C, based on a polyimide/stainless steel/polyimide sandwich structure with an overall thickness of 0.2 mm. The constraints will be described and the resulting vacuum system design, the apertures and the residual stray field will be presented.  
RPPE043 Ultrathin Polyimide-Stainless Steel Heater for Vacuum System Bake-Out 2744
 
  • C. Rathjen, S. Blanchard, B. Henrist, K. Koelemeijer, B. Libera, P. Lutkiewicz
    CERN, Geneva
 
  Space constraints in several normal conducting magnets of the LHC required the development of a dedicated permanent heater for vacuum chamber bake-out. The new heater consists of stainless steel bands inside layers of polyimide. The overall heater thickness is about 0.3 mm. The low magnetic permeability is suitable for applications in magnetic fields. The material combination allows for temperatures high enough to activate a NEG coating. Fabrication is performed in consecutive steps of tape wrapping. Automation makes high volume production at low costs possible. About 800 m of warm vacuum system of the long straight sections of the LHC will be equipped with the new heater. This paper covers experience gained at CERN from studies up to industrialization.