A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Erickson, R.A.

Paper Title Page
TPPP032 Proposal for a Multi-Use Test Beam Area in the SLAC B-Line 2221
 
  • P. Emma, L.D. Bentson, R.A. Erickson, H. Fieguth, J. Seeman, A. Seryi
    SLAC, Menlo Park, California
 
  Funding: Work supported by U.S. Department of Energy contract DE-AC02-76SF00515.

With the impending construction of the Linac Coherent Light Source (LCLS) at SLAC, displacing the well-used Final Focus Test Beam (FFTB) area, there is growing interest in developing a new test beam facility, available during LCLS operations and located in the old B-Line tunnel at the end of the linac. The success of the Sub-Picosecond Pulse Source (SPPS) and the desire to preserve this capacity suggests a new beamline with similar or improved electron beam quality, including bunch length compression to 10 microns. Beam availability during LCLS operations requires a new 1.2-km bypass line connecting the 2/3-point of the linac with the B-Line. A second operating mode, with LCLS not in use, involves a trajectory directly from the end of the linac to the B-line. This feature provides the highest beam quality at 30 GeV, and also allows a possible third operational mode by deflecting a few of the very high-brightness 120-Hz, 14-GeV LCLS bunches at low rate (1-10 Hz) into the B-line. Finally, linear collider research can be carried out in a short final focus system at the end of the B-Line, capable of producing a 70-nm rms beam size. We describe a possible design for these systems.

 
TPPP035 Performance of the PEP-II B-Factory Collider at SLAC 2369
 
  • J. Seeman, J. Browne, Y. Cai, S. Colocho, F.-J. Decker, M.H. Donald, S. Ecklund, R.A. Erickson, A.S. Fisher, J.D. Fox, S.A. Heifets, R.H. Iverson, A. Kulikov, N. Li, A. Novokhatski, M.C. Ross, P. Schuh, T.J. Smith, K.G. Sonnad, M. Stanek, M.K. Sullivan, P. Tenenbaum, D. Teytelman, J.L. Turner, D. Van Winkle, M. Weaver, U. Wienands, M. Woodley, Y.T. Yan, G. Yocky
    SLAC, Menlo Park, California
  • M.E. Biagini
    INFN/LNF, Frascati (Roma)
  • W. Kozanecki
    CEA/DSM/DAPNIA, Gif-sur-Yvette
  • C. Steier, A. Wolski
    LBNL, Berkeley, California
  • G. Wormser
    IPN, Orsay
 
  Funding: Work supported by DOE contract DE-AC02-76SF00515.

For the PEP-II Operation Staff: PEP-II is an asymmetric e+e- collider operating at the Upsilon 4S and has recently set several performance records. The luminosity has reached 9.2 x 1033/cm2/s. PEP-II has delivered an integrated luminosity of 710/pb in one day. It operates in continuous injection mode for both beams boosting the integrated luminosity. The peak positron current has reached 2.55 A in 1588 bunches. The total integrated luminosity since turn on in 1999 has reached 256/fb. This paper reviews the present performance issues of PEP-II and also the planned increase of luminosity in the near future to over 2 x 1034/cm2/s. Upgrade details and plans are discussed.

 
RPPP036 A Test Facility for the International Linear Collider at SLAC End Station A for Prototypes of Beam Delivery and IR Components 2461
 
  • M. Woods, R.A. Erickson, J.C. Frisch, C. Hast, R.K. Jobe, L. Keller, T.W. Markiewicz, T.V.M. Maruyama, D.J. McCormick, J. Nelson, N. Phinney, T.O. Raubenheimer, M.C. Ross, A. Seryi, S. Smith, Z. Szalata, P. Tenenbaum, M. Woodley
    SLAC, Menlo Park, California
  • D.A.-K. Angal-Kalinin, C.D. Beard, F.J. Jackson, A. Kalinin
    CCLRC/DL/ASTeC, Daresbury, Warrington, Cheshire
  • R. Arnold
    University of Massachusetts, Amherst
  • D. Bailey
    ,
  • R.J. Barlow, G.Yu. Kourevlev, A. Mercer
    UMAN, Manchester
  • S.T. Boogert, A. Liapine, S. Malton, D.J. Miller, M.W. Wing
    UCL, London
  • P. Burrows, G.B. Christian, C.C. Clarke, A.F. Hartin, S. Molloy, G.R. White
    Queen Mary University of London, London
  • D. Burton, N. Shales, J. Smith, A. Sopczak, R. Tucker
    Microwave Research Group, Lancaster University, Lancaster
  • D. Cussans
    University of Bristol, Bristol
  • C. Densham, J. Greenhalgh
    CCLRC/DL, Daresbury, Warrington, Cheshire
  • M.H. Hildreth
    Notre Dame University, Notre Dame, Iowa
  • Y.K. Kolomensky
    UCB, Berkeley, California
  • W.F.O. Müller, T. Weiland
    TEMF, Darmstadt
  • N. Sinev, E.T. Torrence
    University of Oregon, Eugene, Oregon
  • M.S. Slater, M.T. Thomson, D.R. Ward
    University of Cambridge, Cambridge
  • Y. Sugimoto
    KEK, Ibaraki
  • S.W. Walston
    LLNL, Livermore, California
  • N.K. Watson
    Birmingham University, Birmingham
  • I. Zagorodnov
    DESY, Hamburg
  • F. Zimmermann
    CERN, Geneva
 
  Funding: U.S. Department of Energy.

The SLAC Linac can deliver damped bunches with ILC parameters for bunch charge and bunch length to End Station A (ESA). A 10Hz beam at 28.5 GeV energy can be delivered to ESA, parasitic with PEP-II operation. During the engineering design phase for the ILC over the next 5 years, we plan to use this facility to prototype and test key components of the Beam Delivery System (BDS) and Interaction Region (IR). We discuss our plans for this ILC Test Facility and preparations for carrying out experiments related to Collimator Wakefields, Materials Damage Tests and Energy Spectrometers. We also plan an IR Mockup of the region within 5 meters of the ILC Interaction Point to investigate effects from backgrounds and beam rf higher-order modes (HOMs).