MPPT090 Design, Construction and Field Characterization of a Variable Polarization Undulator for SOLEIL 4242
 
  • B. Diviacco, R. Bracco, C. Knapic, D. Millo, D.Z. Zangrando
    ELETTRA, Basovizza, Trieste
  • O.V. Chubar, A. Dael, M. Massal
    SOLEIL, Gif-sur-Yvette
  • Z. Martí
    LLS, Bellaterra (Cerdanyola del Vallès)
 
  Two variable polarization undulators (HU80) are being designed and constructed in the framework of an ELETTRA-SOLEIL collaboration. The four-quadrant permanent magnet structure, of the APPLE-II type, will produce various polarization modes by means of parallel or anti-parallel displacement of two diagonally opposite magnet arrays. In this paper the main aspects of the magnetic and mechanical design will be summarized. The post-assembly field quality optimization methods will be described in some detail, discussing our approach to the correction of phase, trajectory and multipole errors. Finally the magnetic measurement results on the completed device will be presented.  
RPAE031 Progress Report on the Construction of SOLEIL 2203
 
  • M.-P. Level, J.C. Besson, P. Brunelle, R. Chaput, A. Dael, J.-C. Denard, J.-M. Filhol, J.M. Godefroy, C. Herbeaux, V. Le Roux, P. Marchand, A. Nadji, L.S.N. Nadolski, R. Nagaoka, M.-A. Tordeux
    SOLEIL, Gif-sur-Yvette
 
  Funding: SOLEIL

This paper reports the progress achieved in the construction of the accelerators of SOLEIL. Started in January 2002, the construction comes near to its end and the installation of the equipment on the site has begun from September 2004 and shall be completed within one year. The progress on the LINAC and Booster are reported separately, therefore this paper will focus more particularly on the Storage Ring: Dedicated measuring benches have been built to perform the magnetic measurements on all the magnets and the results of measurements have been analysed in term of particle dynamics behaviour in order to prepare the operating point for the commissioning. The status of innovative developments engaged from the beginning as super-conducting RF cavities, NEG coated vacuum chambers and BPMs digital electronics will be described. The construction of the first 6 insertion devices is also well advanced and will be reported. Finally, the machine impedance budget was further evaluated with consequently, still some modifications to the design of some components.