Paper |
Title |
Page |
TPAE034 |
Using Ferrite as a Fast Switch for Improving Rise Time of IPNS Extraction Kicker |
1159 |
|
- L.I. Donley, J.C. Dooling, G.E. McMichael (ANL)
|
|
TPAE036 |
The LHC Injection Kicker Magnet |
1162 |
|
- L. Ducimetiere, N. Garrel (CERN), M.J. Barnes, G.D. Wait (TRIUMF)
|
|
TPAE038 |
Switching Power Supply for the PFL Kicker Magnet |
1165 |
|
- H. Sato, S. Igarashi, T. Kawakubo, S. Murasugi, E. Nakamura, S. Yamanaka (KEK), T. Hatano, N. Shimizu (NGK Insulators, Ltd.), A. Tokuchi (Nichicon Corporation)
|
|
TPAE039 |
Accelerated Neutron-Induced Failure Tests of 3300-V IGBTs for the Spallation Neutron Source Accelerator |
1168 |
|
- D.L. Borovina, J. Bradley III, T. Hardek, M.T. Lynch, M. Pieck, R.S. Przeklasa, W.A. Reass, D.E. Rees, S.C. Ruggles, B.E. Takala, P.J. Tallerico, S.A. Wender (LANL)
|
|
TPAE040 |
Electrical Breakdown Studies with Mycalex Insulators |
1171 |
|
- W. Waldron, S. Eylon, W. Greenway, E. Henestroza, S.S. Yu (LBNL)
|
|
TPAE041 |
A Critical Analysis of IGBT Geometries, with the Intention of Mitigating Undesirable Destruction Caused by Fault Scenarios of an Adverse Nature |
1174 |
|
|
|