Paper |
Title |
Page |
TPPB006 |
Injection Acceleration and Extraction of High Intensity Proton Beam for the "Neutrino Facility" Project at BNL |
1637 |
|
- N. Tsoupas, J. Alessi, D. Barton, G. Ganetis, A. Jain, Y.-Y. Lee, I. Marneris, W. Meng, D. Raparia, T. Roser, A.G. Ruggiero, J. Tuozzolo, P. Wanderer, W.T. Weng (BNL)
|
|
TPPB044 |
Concept Design of the Target/Horn System for the BNL Neutrino Oscillation Experiment |
1709 |
|
- N. Simos, A. Carroll, M. Diwan, S.A. Kahn, H. Kirk, H. Ludewig, D. Raparia, W.T. Weng (BNL), K.T. McDonald (Princeton University), G. Evangelakis (University of Ioannina)
|
|
WOAD001 |
Neutrino Beam Facilities and Projects |
429 |
|
- W.T. Weng, M. Diwan (BNL)
|
|
RPAB031 |
AGS Upgrade to 1-MW with a Super-Conducting Linac Injector |
2793 |
|
- A.G. Ruggiero, J. Alessi, D. Raparia, T. Roser, W.T. Weng (BNL)
|
|
ROPA001 |
Spallation Neutron Source Ring -- Status, Challenges, Issues, and Perspectives |
571 |
|
- J. Wei, Y.-Y. Lee, D. Raparia, J. Sandberg, J. Tuozzolo, W.T. Weng (BNL)
|
|