Paper | Title | Page |
---|---|---|
TUA1IO01 |
Status of FRIB | |
|
||
The Facility for Rare Isotope Beams (FRIB) is based on a continuous-wave superconducting heavy ion linac to accelerate all the stable isotopes to above 200 MeV/u. The anticipated beam power is 400 kW, being approximately two-to-three orders of magnitude higher than those of operating heavy-ion facilities. The FRIB Project entered into full construction phase recently. This report summarizes the current design and construction status. | ||
![]() |
Slides TUA1IO01 [15.160 MB] | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |