Author: Folz, C.
Paper Title Page
WEPOA24 Installation and Commissioning of an Ultrafast Electron Diffraction Facility as Part of the ATF-II Upgrade 742
 
  • M.A. Palmer, M. Babzien, M.G. Fedurin, C. Folz, M. Fulkerson, K. Kusche, J.J. Li, R. Malone, T.V. Shaftan, J. Skaritka, L. Snydstrup, C. Swinson, F.J. Willeke
    BNL, Upton, Long Island, New York, USA
 
  Funding: This work was funded by the US Department of Energy under contract DE-SC0012704.
The Accelerator Test Facility (ATF) at Brookhaven National Laboratory (BNL) is presently carrying out an upgrade, ATF-II, which will provide significantly expanded experimental space and capabilities for its users. One of the new capabilities being integrated into the ATF-II program is an Ultrafast Electron Diffraction (UED) beam line, which was originally deployed in the BNL Source Development Laboratory. Inclusion of the UED in the ATF-II research portfolio will enable ongoing development and extension of the UED capabilities for use in materials research. We discuss the design, installation and commissioning of the UED beam line at ATF-II as well as plans for future upgrades.
 
poster icon Poster WEPOA24 [18.332 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2016-WEPOA24  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPOB60 Commissioning of CeC PoP Accelerator 1027
 
  • I. Pinayev, Z. Altinbas, J.C.B. Brutus, A.J. Curcio, A. Di Lieto, C. Folz, W. Fu, D.M. Gassner, Y. Hao, M. Harvey, T. Hayes, R.L. Hulsart, J.P. Jamilkowski, Y.C. Jing, P. K. Kankiya, D. Kayran, R. Kellermann, V. Litvinenko, G.J. Mahler, M. Mapes, K. Mernick, R.J. Michnoff, K. Mihara, T.A. Miller, G. Narayan, P. Orfin, M.C. Paniccia, D. Phillips, T. Rao, F. Severino, B. Sheehy, J. Skaritka, L. Smart, K.S. Smith, V. Soria, Z. Sorrell, R. Than, J.E. Tuozzolo, E. Wang, G. Wang, B. P. Xiao, W. Xu, A. Zaltsman, Z. Zhao
    BNL, Upton, Long Island, New York, USA
  • I. Petrushina
    SUNY SB, Stony Brook, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
Coherent electron cooling is new cooling technique to be tested at BNL. Presently we are in the commissioning stage of the accelerator system. In this paper we present status of various systems and achieved beam parameters as well as operational experience. Near term future plans are also discussed.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2016-WEPOB60  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)