Author: Huang, X.
Paper Title Page
THPPP036 Prototype of High Stability Mechanical Support for SHINE Project 328
 
  • R. Deng, H.X. Deng, F. Gao, X. Huang, Z. Lei, T.T. Zhen
    SARI-CAS, Pudong, Shanghai, People’s Republic of China
 
  Funding: CAS Project for Young Scientists in Basic Research (YSBR-042), National Natural Science Foundation of China (12125508, 11935020)¿Program of Shanghai Academic/Technology Research Leader (21XD1404100).
Quadrupole stability of undulator segment is key to the beam performance in SHINE project. Vibration stability requirement of quadrupole is not larger than 200nm displacement RMS between 1 and 100Hz, but the field test of SHINE tunnel shows that the underground vibration during the day time is greater than 200nm. In this paper, a mechanical support including marble base and active vibration reduction platform is sophisticated designed. With this support, vibration stability of the key quadrupole is expected to be improved and the performances of the quadrupole meet the demands.
 
DOI • reference for this paper ※ doi:10.18429/JACoW-MEDSI2023-THPPP036  
About • Received ※ 25 October 2023 — Revised ※ 07 November 2023 — Accepted ※ 08 November 2023 — Issued ※ 12 January 2024
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)