Keyword: superconducting-RF
Paper Title Other Keywords Page
MOPLR020 Challenges in Realizing the LCLS-II Cryomodule Production cryomodule, cavity, SRF, linac 181
 
  • A. Burrill
    SLAC, Menlo Park, California, USA
 
  The LCLS-II project requires the assembly and installation of 37 cryomodules in order to deliver a 4 GeV electron beam to the undulators to produce both soft and hard x-rays at a repetition rate up to 1 MHz. All of the cryomodules will operate in continuous wave mode, with 35 operating at 1.3 GHz for acceleration and 2 operating at 3.9 GHz to linearize the longitudinal beam profile. One of the challenges of this project, and the topic of this paper, is coordinating the effort of three DOE labs in order to realize this machine in just a few years time. This coordination is necessary due to the fact that the cryomodules will be assembled at both Jefferson Lab and Fermi Lab, tested, and then shipped to SLAC for installation, commissioning and operation. This paper will report on our experiences to date, issues that have been identified and planned mitigation going forward.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-MOPLR020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)