TUPLR029 | FRIB HWR Tuner Development | 535 |
|
||
Funding: * This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661, the State of Michigan and Michigan State University During the last two years the HWR pneumatic tuner development at FRIB evolved from the first prototypes to the final production design. A lot of warm testing and several cryogenic integrated tests with cavity were performed to optimize the tuner features. The main challenges included the bellow bushings binding and very tight space limitations for the assembly on the rail. The final design, based on the acquired experience, was prepared in collaboration with ANL and entered the preproduction phase. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-TUPLR029 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WE2A02 | FRIB Cryomodule Design and Production | 673 |
|
||
Funding: U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661 The Facility for Rare Isotope Beams (FRIB), under con-struction at Michigan State University, will utilize a driver linac to accelerate stable ion beams from protons to ura-nium up to energies of >200 MeV per nucleon with a beam power of up to 400 kW. Superconducting technology is widely used in the FRIB project, including the ion sources, linac, and experiment facilities. The FRIB linac consists of 48 cryomodules containing a total of 332 superconducting radio-frequency (SRF) resonators and 69 superconducting solenoids. We report on the design and the construction of FRIB cryomodules. |
||
![]() |
Slides WE2A02 [3.823 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-WE2A02 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THOP10 | Design and Commissioning of FRIB Multipacting-Free Fundamental Power Coupler | 767 |
THPLR010 | use link to see paper's listing under its alternate paper code | |
|
||
Funding: *Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661 The original Fundamental Power Coupler (FPC) of Half-Wave Resonator (HWR) for the Facility of Rare Isotope Beams (FRIB) requires multipacting conditioning at operating RF power which is up to 5 kW Continue Wave (CW). Conditioning takes a lot of time and RF power, and its elimination is highly desirable. To significantly shorten the RF conditioning, we developed a multipacting-free coupler design. This paper reports the latest progress in the optimization and prototype tests of multipacting-free coupler. The choke structure is removed and coupler geometry is further modified to protect the coupler RF window from the electron bombardment. The comparison result of multipacting-free coupler with original coupler was performed on automatic conditioning system, which showed significantly time reducing for RF conditioning. |
||
![]() |
Slides THOP10 [2.442 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-THOP10 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPRC013 | Design of a FRIB Half-Wave Pre-Production Cryomodule | 795 |
|
||
Funding: This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE SC0000661. The driver linac for the Facility for Rare Isotope Beams (FRIB) will require the production of 48 cryomodules (CMs). In addition to the β=0.085 quarter-wave CM, FRIB has completed the design of a β=0.53 half-wave CM as a pre-production prototype. This CM will qualify the performance of the resonators, fundamental power couplers, tuners, and cryogenic systems of the β=0.53 half-wave design. In addition to the successful systems qualification; the β=0.53 CM build will also verify the FRIB bottom up assembly and alignment method on a half-wave CM type. The lessons learned from the β=0.085 pre-production CM build including valuable fabrication, sourcing, and assembly experience have been applied to the design of β=0.53 half-wave CM. This paper will report the design of the β=0.53 half-wave CM as well as the CM interfaces within the linac tunnel. |
||
![]() |
Poster THPRC013 [0.954 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-THPRC013 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPRC021 | Status of β=0.53 Pre-Production Cryomodule | 811 |
|
||
Funding: This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE SC0000661. The driver linac for the Facility for Rare Isotope Beams (FRIB) comprises four kinds of cavities (=0.041, 0.085, 0.29, and 0.53) and six types of cryomodules including matching modules. FRIB has started the fabrication of a β=0.53 preproduction cryomodule, which is the first prototype for a half-wave (=0.29 and 0.53) cavity. This paper describes the fabrication progress and the lessons learned from the β=0.53 preproduction cryomodule. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-THPRC021 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |