Author: Popielarski, L.
Paper Title Page
MO1A01 The FRIB Superconducting Linac - Status and Plans 1
 
  • J. Wei, H. Ao, S. Beher, N.K. Bultman, F. Casagrande, C. Compton, L.R. Dalesio, K.D. Davidson, A. Facco, F. Feyzi, V. Ganni, A. Ganshyn, P.E. Gibson, T. Glasmacher, W. Hartung, L. Hodges, L.T. Hoff, H.-C. Hseuh, A. Hussain, M. Ikegami, S. Jones, K. Kranz, R.E. Laxdal, S.M. Lidia, G. Machicoane, F. Marti, S.J. Miller, D.G. Morris, A.C. Morton, J.A. Nolen, P.N. Ostroumov, J.T. Popielarski, L. Popielarski, G. Pozdeyev, T. Russo, K. Saito, G. Shen, S. Stanley, H. Tatsumoto, T. Xu, Y. Yamazaki
    FRIB, East Lansing, USA
  • K. Dixon, M. Wiseman
    JLab, Newport News, Virginia, USA
  • A. Facco
    INFN/LNL, Legnaro (PD), Italy
  • K. Hosoyama
    KEK, Ibaraki, Japan
  • H.-C. Hseuh
    BNL, Upton, Long Island, New York, USA
  • M.P. Kelly, J.A. Nolen
    ANL, Argonne, Illinois, USA
  • R.E. Laxdal
    TRIUMF, Vancouver, Canada
 
  With an average beam power two orders of magnitude higher than operating heavy-ion facilities, the Facility for Rare Isotope Beams (FRIB) stands at the power frontier of the accelerator family. This report summarizes the current design and construction status as well as plans for commissioning, operations and upgrades.
Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661 and the National Science Foundation under Cooperative Agreement PHY-1102511.
 
slides icon Slides MO1A01 [48.813 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-MO1A01  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPRC024 Design and Implementation of an Automated High-Pressure Water Rinse System for FRIB SRF Cavity Processing 468
 
  • I.M. Malloch, E.S. Metzgar, L. Popielarski, S. Stanley
    FRIB, East Lansing, USA
 
  Funding: This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE SC0000661, the State of Michigan and Michigan State University.
Traditionally, high-pressure water rinse (HPR) systems have consisted of relatively simple pump and rinse wand actuator systems intended to clean superconducting radio frequency (SRF) cavities during processing prior to test assembly. While these types of systems have proven effective at achieving satisfactory levels of cleanliness, large amounts of operator touch-labor are involved, especially in SRF cavities with complex geometries, where several fixture changes and cavity manipulations may be required. With this labor comes the risk of cavity damage or contamination, and the expense of the operator's time. To reduce this operator intervention and maximize cavity cleanliness and process throughput, a new, fully-automated, robotic HPR system has been commissioned in the Facility for Rare Isotope Beams (FRIB) cavity processing facility. This paper summarizes the design and commissioning process of the HPR system, and demonstrates improvements to the FRIB processing facility through the minimization of cavity contamination risk and reduction of technician labor through system automation. Comparative cavity RF test results are presented to further demonstrate system effectiveness.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-TUPRC024  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPLR033 First FRIB β=0.041 Production Coldmass Build 541
 
  • K. Elliott, S.J. Miller, B. Oja, J.T. Popielarski, L. Popielarski, D.R. Victory, M.S. Wilbur, T. Xu
    FRIB, East Lansing, Michigan, USA
  • M. Wiseman
    JLab, Newport News, Virginia, USA
 
  Funding: This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE SC0000661, the State of Michigan and Michigan State University.
Three β=0.041 cryomodules are required for the Facility for Rare Isotope Beams (FRIB) accelerator. Cleanroom assembly of all three coldmasses for these cryomodules has been completed. The cleanroom assembly includes; the superconducting radio frequency (SRF) cavities, the superconducting solenoids, fundamental power couplers (FPC), beam position monitors, alignment rail, and transport cart. This paper will provide an overview of the techniques and procedures used to assemble this cavity string such that it can be used in the FRIB accelerator.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-TUPLR033  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WE2A02 FRIB Cryomodule Design and Production 673
 
  • T. Xu, H. Ao, B. Bird, N.K. Bultman, E.E. Burkhardt, F. Casagrande, C. Compton, J.L. Crisp, K.D. Davidson, K. Elliott, A. Facco, V. Ganni, A. Ganshyn, W. Hartung, M. Ikegami, P. Knudsen, S.M. Lidia, I.M. Malloch, S.J. Miller, D.G. Morris, P.N. Ostroumov, J.T. Popielarski, L. Popielarski, M.A. Reaume, K. Saito, S. Shanab, G. Shen, M. Shuptar, S. Stark, J. Wei, J.D. Wenstrom, M. Xu, Y. Xu, Y. Yamazaki, Z. Zheng
    FRIB, East Lansing, USA
  • A. Facco
    INFN/LNL, Legnaro (PD), Italy
  • K. Hosoyama
    KEK, Ibaraki, Japan
  • M.P. Kelly
    ANL, Argonne, Illinois, USA
  • R.E. Laxdal
    TRIUMF, Vancouver, Canada
  • M. Wiseman
    JLab, Newport News, Virginia, USA
 
  Funding: U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661
The Facility for Rare Isotope Beams (FRIB), under con-struction at Michigan State University, will utilize a driver linac to accelerate stable ion beams from protons to ura-nium up to energies of >200 MeV per nucleon with a beam power of up to 400 kW. Superconducting technology is widely used in the FRIB project, including the ion sources, linac, and experiment facilities. The FRIB linac consists of 48 cryomodules containing a total of 332 superconducting radio-frequency (SRF) resonators and 69 superconducting solenoids. We report on the design and the construction of FRIB cryomodules.
 
slides icon Slides WE2A02 [3.823 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-WE2A02  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRC013 Design of a FRIB Half-Wave Pre-Production Cryomodule 795
 
  • S.J. Miller, H. Ao, B. Bird, G.D. Bryant, B. Bullock, N.K. Bultman, F. Casagrande, C. Compton, A. Facco, W. Hartung, J.D. Hulbert, D.G. Morris, P.N. Ostroumov, J.T. Popielarski, L. Popielarski, M.A. Reaume, K. Saito, M. Shuptar, J. Simon, S. Stark, B.P. Tousignant, J. Wei, J.D. Wenstrom, K. Witgen, T. Xu, Z. Zheng
    FRIB, East Lansing, USA
  • A. Facco
    INFN/LNL, Legnaro (PD), Italy
  • M.P. Kelly
    ANL, Argonne, Illinois, USA
 
  Funding: This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE SC0000661.
The driver linac for the Facility for Rare Isotope Beams (FRIB) will require the production of 48 cryomodules (CMs). In addition to the β=0.085 quarter-wave CM, FRIB has completed the design of a β=0.53 half-wave CM as a pre-production prototype. This CM will qualify the performance of the resonators, fundamental power couplers, tuners, and cryogenic systems of the β=0.53 half-wave design. In addition to the successful systems qualification; the β=0.53 CM build will also verify the FRIB bottom up assembly and alignment method on a half-wave CM type. The lessons learned from the β=0.085 pre-production CM build including valuable fabrication, sourcing, and assembly experience have been applied to the design of β=0.53 half-wave CM. This paper will report the design of the β=0.53 half-wave CM as well as the CM interfaces within the linac tunnel.
 
poster icon Poster THPRC013 [0.954 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-THPRC013  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRC021 Status of β=0.53 Pre-Production Cryomodule 811
 
  • H. Ao, B. Bird, G.D. Bryant, B. Bullock, N.K. Bultman, C. Compton, A. Facco, J.D. Hulbert, S.J. Miller, J.T. Popielarski, L. Popielarski, M.A. Reaume, K. Saito, M. Shuptar, J. Simon, S. Stark, B.P. Tousignant, J.D. Wenstrom, K. Witgen, T. Xu, Z. Zheng
    FRIB, East Lansing, USA
 
  Funding: This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE SC0000661.
The driver linac for the Facility for Rare Isotope Beams (FRIB) comprises four kinds of cavities (=0.041, 0.085, 0.29, and 0.53) and six types of cryomodules including matching modules. FRIB has started the fabrication of a β=0.53 preproduction cryomodule, which is the first prototype for a half-wave (=0.29 and 0.53) cavity. This paper describes the fabrication progress and the lessons learned from the β=0.53 preproduction cryomodule.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-THPRC021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)