THPLR029 | Update on the SC 325 MHz CH-Cavity and Power Coupler Processing | 913 |
|
||
Funding: Work supported by GSI, BMBF Contr. No. 05P15RFRBA The 325 MHz CH-Cavity which has been developed and successfully vertically tested at the Institute for Applied Physics, Frankfurt, has reached the final production stage. The helium vessel has been welded to the frontal joints of the cavity and further tests in a horizontal environment are in preparation. Furthermore the corresponding power couplers have been conditioned and tested at a dedicated test stand up to the power level of 40 kW (pulsed) for the targeted beam operation. The final step of the whole prototype development is a beam test with a 11.4 AMeV, 10 mA ion beam at GSI, Darmstadt. |
||
![]() |