Author: Lunin, A.
Paper Title Page
MOPLR006 Monopole HOMs Dumping in the LCLS-II 1.3 GHz Structure 142
 
  • A. Lunin, T.N. Khabiboulline, N. Solyak
    Fermilab, Batavia, Illinois, USA
 
  Funding: Operated by Fermi Research Alliance, LLC, under Contract DE-AC02-07CH11359 with the U.S. DOE
Developing an upgrade of Linac Coherent Light Source (LCLS-II) is currently underway. The central part of LCLS-II is a continuous wave superconducting RF (CW SRF) electron linac. High order modes (HOMs) excited in SRF structures by passing beam may deteriorate beam quality and affect beam stability. In this paper we report the simulation results of monopole High Order Modes (HOM) spectrum in the 1.3 GHz accelerating structure. Optimum parameters of the HOM feedthrough are suggested for minimizing RF losses on the HOM antenna tip and for preserving an efficiency of monopole HOMs damping simultaneously.
 
poster icon Poster MOPLR006 [0.647 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-MOPLR006  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPLR007 Redesign of the End Group in the 3.9 GHz LCLS-II Cavity 145
 
  • A. Lunin, I.V. Gonin, T.N. Khabiboulline, N. Solyak
    Fermilab, Batavia, Illinois, USA
 
  Funding: Operated by Fermi Research Alliance, LLC, under Contract DE-AC02-07CH11359 with the U.S. DOE
Development and production of Linac Coherent Light Source II (LCLS-II) is underway. The central part of LCLS-II is a continuous wave superconducting RF (CW SCRF) electron linac. The 3.9 GHz third harmonic cavity similar to the XFEL design will be used in LCLS-II for linearizing the longitudinal beam profile*. The initial design of the 3.9 GHz cavity developed for XFEL project has a large, 40 mm, beam pipe aperture for better higher-order mode (HOM) damping. It is resulted in dipole HOMs with frequencies nearby the operating mode, which causes difficulties with HOM coupler notch filter tuning. The CW linac operation requires an extra caution in the design of the HOM coupler in order to prevent its possible overheating. In this paper we present the modified 3.9 GHz cavity End Group for meeting the LCLS-II requirements
* LCLS-II 3.9 GHz Cryomodules, Physics Requirements Document, LCLSII-4.1-PR-0097-R1, SLAC, USA, 2015
 
poster icon Poster MOPLR007 [1.590 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-MOPLR007  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPLR022 Commissioning and First Results from the Fermilab Cryomodule Test Stand 185
 
  • E.R. Harms, M.H. Awida, C.M. Baffes, K. Carlson, S.K. Chandrasekaran, B.E. Chase, E. Cullerton, J.P. Edelen, J. Einstein, C.M. Ginsburg, A. Grassellino, B.J. Hansen, J.P. Holzbauer, S. Kazakov, T.N. Khabiboulline, M.J. Kucera, J.R. Leibfritz, A. Lunin, D. McDowell, M.W. McGee, D.J. Nicklaus, D.F. Orris, J.P. Ozelis, J.F. Patrick, T.B. Petersen, Y.M. Pischalnikov, P.S. Prieto, O.V. Prokofiev, J. Reid, W. Schappert, D.A. Sergatskov, N. Solyak, R.P. Stanek, D. Sun, M.J. White, C. Worel, G. Wu
    Fermilab, Batavia, Illinois, USA
 
  Funding: Operated by Fermi Research Alliance, LLC under Contract No. De-AC02-07CH11359 with the United States Department of Energy.
A new test stand dedicated to SRF cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans.
 
poster icon Poster MOPLR022 [3.431 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-MOPLR022  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOP106018 Measurement of the Transverse Beam Dynamics in a TESLA-type Superconducting Cavity 323
SPWR025   use link to see paper's listing under its alternate paper code  
 
  • A. Halavanau, P. Piot
    Northern Illinois University, DeKalb, Illinois, USA
  • N. Eddy, D.R. Edstrom, A. Lunin, P. Piot, J. Ruan, N. Solyak
    Fermilab, Batavia, Illinois, USA
 
  Funding: US Department of Energy (DOE) under contract DE-SC0011831 with Northern Illinois University. Fermilab is operated by the Fermi Research Alliance LLC under US DOE contract DE-AC02-07CH11359.
Superconducting linacs are capable of producing intense, ultra-stable, high-quality electron beams that have widespread applications in Science and Industry. Many project are based on the 1.3-GHz TESLA-type superconducting cavity. In this paper we provide an update on a recent experiment aimed at measuring the transfer matrix of a TESLA cavity at the Fermilab Accelerator Science and Technology (FAST) facility. The results are discussed and compared with analytical and numerical simulations.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-MOP106018  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRC014 RF Losses in 1.3 GHz Cryomodule of The LCLS-II Superconducting CW Linac 798
 
  • A. Saini, A. Lunin, N. Solyak, A.I. Sukhanov, V.P. Yakovlev
    Fermilab, Batavia, Illinois, USA
 
  The Linac Coherent Light Source (LCLS) is an x-ray free electron laser facility. The proposed upgrade of the LCLS facility is based on construction of a new 4 GeV superconducting (SC) linac that will operate in continuous wave (CW) mode. The major infrastructure investments and the operating cost of a SC CW linac are outlined by its cryogenic requirements. Thus, a detail understanding of RF losses in the cryogenic environment is critical for the entire project. In this paper we review RF losses in a 1.3 GHz accelerating cryomodule of the LCLS-II linac. RF losses due to various sources such untrapped higher order modes (HOMs), resonant losses etc. are addressed and presented here.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-THPRC014  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPLR027 Progress Towards a 2.0 K Half-Wave Resonator Cryomodule for Fermilab's PIP-II Project 906
 
  • Z.A. Conway, A. Barcikowski, G.L. Cherry, R.L. Fischer, B.M. Guilfoyle, C.S. Hopper, M. Kedzie, M.P. Kelly, S.H. Kim, S.W.T. MacDonald, P.N. Ostroumov, T. Reid
    ANL, Argonne, Illinois, USA
  • V.A. Lebedev, A. Lunin
    Fermilab, Batavia, Illinois, USA
 
  Funding: This material is supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics and Office of High-Energy Physics, Contracts No. DE-AC02-76-CH03000 and DE-AC02-06CH11357.
In support of Fermilab's Proton Improvement Plan-II project Argonne National Laboratory is constructing a superconducting half-wave resonator cryomodule. This cryomodule is designed to operate at 2.0 K, a first for low-velocity ion accelerators, and will accelerate ≥1 mA proton/H beams from 2.1 to 10.3 MeV. Since 2014 the construction of 9 162.5 MHz b = 0.112 superconducting half-wave resonators, the vacuum vessel and the majority of the cryomodule subsystems have been finished. Here we will update on the status of this work and report on preliminary cavity test results. This will include cavity performance measurements where we found residual resistances of < 3 nanoOhms at low fields and peak voltage gains of 5.9 MV, which corresponds to peak surface fields of 134 MV/m and 144 mT electric and magnetic respectively.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-THPLR027  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPLR041 650 MHz Elliptical Superconducting RF Cavities for PIP-II Project 943
 
  • I.V. Gonin, E. Borissov, A. Grassellino, C.J. Grimm, V. Jain, S. Kazakov, V.A. Lebedev, A. Lunin, C.S. Mishra, D.V. Mitchell, T.H. Nicol, Y.M. Pischalnikov, G.V. Romanov, A.M. Rowe, N.K. Sharma, N. Solyak, V.P. Yakovlev
    Fermilab, Batavia, Illinois, USA
 
  The PIP-II 800 MeV linac employs 650 MHz elliptical 5-cell CW-capable cavities to accelerate up to 2 mA peak beam current of H in the energy range 185 - 800 MeV. The low beta (LB) βG = 0.61 portion should accelerate from 185 MeV-500 MeV using 33 LB dressed cavities in 11 cryomodules. The high beta (HB) βG = 0.92 portion of the linac should accelerate from 500 to 800 MeV using 24 HB dressed cavities in 4 cryomodules. The development of both LB and HB cavities is going on under IIFC collaboration. The development of LB cavity initiated at VECC Kolkatta and HB cavity is going at RRCAT, Indore. This paper present design methodology adopted starting from RF design to get mechanical dimensions of the RF cells and then explains dressing of the cavity for both low beta and high beta cavities. Further the tuner design and its integration to the dressed cavity is discussed. Paper also explains the salient design features of these dressed cavities.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-THPLR041  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)