Author: Gastineau, B.
Paper Title Page
MOOP01 The SARAF-LINAC Project Status 38
MOPLR075   use link to see paper's listing under its alternate paper code  
 
  • N. Pichoff, B. Gastineau, P. Girardot
    CEA/DSM/IRFU, France
  • N. Bazin, D. Chirpaz-Cerbat, B. Dalena, G. Ferrand, P. Gastinel, F. Gougnaud, M. Jacquemet, C. Madec, P.A.P. Nghiem, D. Uriot
    CEA/IRFU, Gif-sur-Yvette, France
  • P. Bertrand, M. Di Giacomo, R. Ferdinand, J.-M. Lagniel
    GANIL, Caen, France
 
  SNRC and CEA collaborate to the upgrade of the SARAF accelerator to 5 mA CW 40 MeV deuteron and proton beams (Phase 2). CEA is in charge of the design, construction and commissioning of the superconducting linac (SARAF-LINAC Project). This paper presents to the accelerator community the status at August 2016 of the SARAF-LINAC Project.  
slides icon Slides MOOP01 [4.978 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-MOOP01  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)