MOPLR022 Commissioning and First Results from the Fermilab Cryomodule Test Stand 185
 
  • E.R. Harms, M.H. Awida, C.M. Baffes, K. Carlson, S.K. Chandrasekaran, B.E. Chase, E. Cullerton, J.P. Edelen, J. Einstein, C.M. Ginsburg, A. Grassellino, B.J. Hansen, J.P. Holzbauer, S. Kazakov, T.N. Khabiboulline, M.J. Kucera, J.R. Leibfritz, A. Lunin, D. McDowell, M.W. McGee, D.J. Nicklaus, D.F. Orris, J.P. Ozelis, J.F. Patrick, T.B. Petersen, Y.M. Pischalnikov, P.S. Prieto, O.V. Prokofiev, J. Reid, W. Schappert, D.A. Sergatskov, N. Solyak, R.P. Stanek, D. Sun, M.J. White, C. Worel, G. Wu
    Fermilab, Batavia, Illinois, USA
 
  Funding: Operated by Fermi Research Alliance, LLC under Contract No. De-AC02-07CH11359 with the United States Department of Energy.
A new test stand dedicated to SRF cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans.
 
poster icon Poster MOPLR022 [3.431 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-MOPLR022  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPLR056 Results of Operation of 162.5 MHz RFQ Couplers 584
 
  • S. Kazakov, J.P. Edelen, T.N. Khabiboulline, O.V. Pronitchev, J. Steimel
    Fermilab, Batavia, Illinois, USA
 
  Two couplers for RFQ of PXEI facility were designed and manufactured. Each coupler designed to deliver 50 KW, CW to RFQ at 162.5 MHz. Results of couplers operation are reported.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-TUPLR056  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WE1A01 PIP-II Injector Test: Challenges and Status 641
 
  • P. Derwent, J.-P. Carneiro, J.P. Edelen, V.A. Lebedev, L.R. Prost, A. Saini, A.V. Shemyakin, J. Steimel
    Fermilab, Batavia, Illinois, USA
 
  The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW-compatible, pulsed H superconducting RF linac. To validate the concept of the front-end of such machine, a test accelerator known as PXIE is under construction. It includes a 10 mA DC, 30 keV H ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) that feeds the first of 2 cryomodules increasing the beam energy to about 25 MeV, and a High Energy Beam Transport section (HEBT) that takes the beam to a dump. The ion source, LEBT, RFQ, and initial version of the MEBT have been built, installed, and commissioned. This report presents the overall status of the PXIE warm front end, including results of the beam commissioning through the installed components, and progress with SRF cryomodules and other systems.  
slides icon Slides WE1A01 [9.457 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-WE1A01  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPLR065 Beam Commissioning Status and Results of the FNAL PIP2IT Linear Accelerator RFQ 1002
 
  • J. Steimel, C.M. Baffes, P. Berrutti, J.-P. Carneiro, J.P. Edelen, T.N. Khabiboulline, L.R. Prost, V.E. Scarpine, A.V. Shemyakin
    Fermilab, Batavia, Illinois, USA
  • A.L. Edelen
    CSU, Fort Collins, Colorado, USA
  • M.D. Hoff, A.R. Lambert, D. Li, T.H. Luo, J.W. Staples, S.P. Virostek
    LBNL, Berkeley, California, USA
  • V.L. Sista
    BARC, Mumbai, India
 
  Funding: Operated by Fermi Research Alliance, LLC under Contract No. De-AC02-07CH11359 with the United States Department of Energy.
An H beam was accelerated through a continuous wave (CW) capable, 4-vane, radio frequency quadrupole (RFQ) at Fermilab that was designed and constructed at Berkeley Lab. This RFQ is designed to accelerate up to 10 mA H beam from 30 keV to 2.1 MeV in a test accelerator (PIP2IT). This paper presents results of specification verification and commissioning.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-THPLR065  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)