PIP-II Injector Test: Challenges and Status |
641 |
|
- P. Derwent, J.-P. Carneiro, J.P. Edelen, V.A. Lebedev, L.R. Prost, A. Saini, A.V. Shemyakin, J. Steimel
Fermilab, Batavia, Illinois, USA
|
|
|
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW-compatible, pulsed H− superconducting RF linac. To validate the concept of the front-end of such machine, a test accelerator known as PXIE is under construction. It includes a 10 mA DC, 30 keV H− ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) that feeds the first of 2 cryomodules increasing the beam energy to about 25 MeV, and a High Energy Beam Transport section (HEBT) that takes the beam to a dump. The ion source, LEBT, RFQ, and initial version of the MEBT have been built, installed, and commissioned. This report presents the overall status of the PXIE warm front end, including results of the beam commissioning through the installed components, and progress with SRF cryomodules and other systems.
|
|
|
Slides WE1A01 [9.457 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2016-WE1A01
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|