MOIOB04 Current Status of PAL-XFEL 26
 
  • I.S. Ko, J.H. Han
    PAL, Pohang, Kyungbuk, Republic of Korea
 
  The PAL-XFEL project aims to produce 0.1~nm coherent X-ray laser to photon beam users. In order to produce such photons, there are 10 GeV electron linac based on S-band normal conducting accelerating structures and a 150 m long out-vacuum undulator system. The project was already started in April 2011, and the 1.1 km long building is expected to be completed by December 2014. The injector test facility (ITF) which is for a test of the first 139 MeV section of the main linac has been installed and is in normal operation at the extension of the PLS linac building. In this paper, we introduce the project in general, a brief summary of site preparation and building construction, beam test results of ITF, and test results of subsystems produced by domestic manufacturers  