Paper | Title | Page |
---|---|---|
MOPP061 | First RF Measurements of the Superconducting 217 MHz CH Cavity for the CW Demonstrator at GSI | 193 |
|
||
Funding: Work supported by GSI, HIM, BMBF Contr. No. 05P12RFRBL Presently, a superconducting (sc) 217 MHz Crossbar-Hmode (CH) cavity is under construction at Research Instruments (RI), Bergisch Gladbach, Germany. Among the horizontal cryomodule and two sc 9.5 T solenoids the cavity is the key component of the cw demonstrator at GSI. To show the operation ability of sc CH cavity technology under a realistic linear accelerator environment is one major goal of the demonstrator project. A successful beam operation of the demonstrator will be a milestone regarding the continuing advanced sc cw linac project at GSI for a competitive production of Super Heavy Elements (SHE) in the future. The fabrication status as well as first rf measurements at room temperature of the 217 MHz CH cavity are presented. |
||
![]() |
Poster MOPP061 [1.741 MB] | |
MOPP064 | R&D of the 17 MeV MYRRHA Injector | 202 |
SUPG010 | use link to see paper's listing under its alternate paper code | |
|
||
Funding: Project supported by the EU, FP7 MAX, Contract No. 269565 MYRRHA is designed as an accelerator driven system (ADS) for transmutation of long-lived radioactive waste. The challenge of the linac development is the very high reliability of the accelerator to limit the thermal stress inside the reactor. With the concept of parallel redundancy the injector will supply a cw proton beam with 4 mA and 17 MeV to the main linac. The new MYRRHA injector layout consists of a very robust beam dynamics design with low emittance growth rates. Sufficient drift space provides plenty room for diagnostic elements and increases the mountability. Behind a 4-Rod-RFQ and a pair of two-gap QWR rebunchers at 1.5 MeV the protons are matched into the CH cavity section. A focussing triplet between the rebunchers ensures an ideal transversal matching into the doublet lattice. Each of the 7 RT CH structures has a constant phase profile and does not exceed thermal losses of 29 kW/m. The transition to the 5 SC CH cavities with constant beta profile is at 5.9 MeV. For a safe operation of the niobium resonators the electric and magnetic peak fields are defined below 25 MV/m and 57 mT respectively. |
||
![]() |
Poster MOPP064 [4.024 MB] | |
TUPP060 | Development of a 217 MHz Superconducting CH Structure | 563 |
SUPG009 | use link to see paper's listing under its alternate paper code | |
|
||
Funding: Helmholtz-Institut Mainz, Bundesministerium für Bildung und Forschung contract number 05P12RFRBL To compete in the production of Super Heavy Elements (SHE) in the future a 7.3 AMeV superconducting (sc) continuous wave (cw) LINAC is planned at GSI. The baseline design consists of 9 sc Crossbar-H-mode (CH) cavities operated at 217 MHz. Currently an advanced cw demonstrator is under design at the Institute for Applied Physics (IAP) at Frankfurt University. The purpose of the advanced demonstrator is to investigate a new concept for the superconducting CH structures. It is based on shorter CH-cavities with 8 equidistant gaps without girders and with stiffening brackets at the front and end cap to reduce the pressure sensitivity. One major goal of the advanced demonstrator is to show that the new design leads to higher acceleration gradients and smaller Ep/Ea values. In this contribution first simulation results and technical layouts will be presented. |
||
![]() |
Poster TUPP060 [0.593 MB] | |