Author: Vogel, E.
Paper Title Page
MOPB017 Integration of the European XFEL Accelerating Modules 207
 
  • E. Vogel, S. Barbanotti, J. Branlard, H. Brueck, S. Choroba, L. Hagge, K. Jensch, V.V. Katalev, D. Kostin, D. Käfer, L. Lilje, A. Matheisen, W.-D. Möller, D. Nölle, B. Petersen, J. Prenting, D. Reschke, H. Schlarb, M. Schmökel, J.K. Sekutowicz, W. Singer, H. Weise
    DESY, Hamburg, Germany
  • J. Świerbleski, P.B. Borowiec
    IFJ-PAN, Kraków, Poland
  • S. Berry, O. Napoly, B. Visentin
    CEA/DSM/IRFU, France
  • A. Bosotti, P. Michelato
    INFN/LASA, Segrate (MI), Italy
  • W. Kaabi
    LAL, Orsay, France
  • C. Madec
    CEA/IRFU, Gif-sur-Yvette, France
  • E.P. Plawski
    NCBJ, Świerk/Otwock, Poland
  • F. Toral
    CIEMAT, Madrid, Spain
 
  The production of the 103 superconducting accelerating modules for the European XFEL is an international effort. Institutes and companies from seven different countries (China, France, Germany, Italy, Poland, Russia and Spain), organized in 12 different work packages contribute with parts, capacity for work and facilities to the production of the modules. Currently the series production of the individual parts started or is approaching. Personnel are trained for the assembly and testing of parts and as well for the complete modules. Here we present an overview and the status of all these activities.  
 
TUPB020 Status of the European XFEL 3.9 GHz system 519
 
  • E. Vogel
    DESY, Hamburg, Germany
  • A. Bosotti, P. Michelato, L. Monaco, C. Pagani, R. Paparella, P. Pierini, D. Sertore
    INFN/LASA, Segrate (MI), Italy
  • E.R. Harms
    Fermilab, Batavia, USA
 
  The third harmonic system at 3.9 GHz of the European XFEL injector section will linearize the bunch RF curvature, induced by first accelerating module, before the first compression stage. This paper presents qualification tests on cavity prototypes and the on-going activities towards the realization of the third harmonic section of the European XFEL in view of its commissioning in 2014.