Paper |
Title |
Page |
MO441 |
High-Power Hybrid Attenuator & Phase-Shifter Systems
|
159 |
|
- S.R. Ohsawa, I. Abe, S. Anami, A. Asami, Y. Ogawa, I. Sato, M. Yokota
KEK, Ibaraki, Japan
|
|
MO443 |
Microwave Source Upgrade of the KEK 2.5-GeV Linac Relevant to B-Factory Project
|
165 |
|
- T. Shidara, S. Anami, A. Asami, H. Honma, K. Nakao
KEK, Ibaraki, Japan
|
|
MO446 |
A Long-Pulse Thyristor-Switched Modulator for the JHP Proton Linac
|
174 |
|
- S. Anami, M. Kawamura, T. Kubo, K. Kudo, M. Ono, T. Takanaka, T. Takanaka
KEK, Ibaraki, Japan
- S. Koseki, S. Ogawa
Hitachi Works, Ibaraki-ken, Japan
|
|
MO466 |
Improvements to the PFN Capacitors for the Klystron Modulators of the KEK 2.5 GeV Linac
|
235 |
|
- H. Honma, S. Anami, A. Asami, T. Shidara
KEK, Ibaraki, Japan
- H. Sakaguchi
Nichikon Co. Ltd, Kusatsu, Shiga-ken, Japan
|
|
TU459 |
Expert System for Diagnosis of Klystron Modulator (KMTS)
|
471 |
|
- I. Abe, S. Anami, A. Asami, H. Hanaki, K. Nakahara
KEK, Ibaraki, Japan
- M. Kitamura
Tohoku University, Sendai, Japan
|
|