Paper | Title | Page |
---|---|---|
MOPOTK012 | Concept of a Polarized Positron Source for CEBAF | 457 |
SUSPMF058 | use link to see paper's listing under its alternate paper code | |
|
||
Funding: Laboratoire de Physique des 2 Infinis Irène Joliot-Curie Université Paris-Saclay -> Eric Voutier : eric.voutier@ijclab.in2p3.fr. Positron beams would provide new and meaningful probes for the experimental program at the Thomas Jefferson National Accelerator Facility (JLab), including but not limited to future hadronic physics and dark matter experiments. Critical requirements involve generating positron beams with a high degree of spin polarization, sufficient intensity and a continuous-wave (CW) bunch train compatible with acceleration to 12 GeV at the Continuous Electron Beam Accelerator Facility (CEBAF). To address these requirements, a polarized positron injector based upon the bremsstrahlung of an intense CW spin polarized electron beam is considered*. First a polarized electron beam line provides >1 mA of polarized electrons at ~120 MeV to a high-power target for positron production. Next, a second beam line collects, shapes and aligns the spin of positrons for users. Finally, the positron beam is matched into the CEBAF acceptance for acceleration and transport to the end stations with energies up to 12 GeV. An optimized layout to provide positrons beams with intensity >100 nA (polarized) or intensity >3 µA (unpolarized) will be discussed in this poster. * D. Abbott et al., "Production of Highly Polarized Positrons Using Polarized Electrons at MeV Energies", Phys. Rev. Lett., 116, 214801 (2016) |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-MOPOTK012 | |
About • | Received ※ 08 June 2022 — Revised ※ 13 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 06 July 2022 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPOTK046 | Design Concept for a Second Interaction Region for the Electron-Ion Collider | 564 |
|
||
Funding: Jefferson Science Associates, LLC under Contract No. DE-AC05-06OR23177, Brookhaven Science Associates, LLC under Contract No. DE-SC0012704 and UT-Battelle, LLC, under contract No. DE-AC05-00OR22725 In addition to the day-one primary Interaction Region (IR), the design of the Electron Ion Collider (EIC) must support operation of a 2nd IR potentially added later. The 2nd IR is envisioned in an existing experimental hall at RHIC IP8, compatible with the same beam energy combinations as the 1st IR over the full center of mass energy range of ~20 GeV to ~140 GeV. The 2nd IR is designed to be complementary to the 1st IR. In particular, a secondary focus is added in the forward ion direction of the 2nd IR hadron beamline to optimize its capability in detecting particles with magnetic rigidities close to those of the ion beam. We provide the current design status of the 2nd IR in terms of parameters, magnet layout and beam dynamics. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-MOPOTK046 | |
About • | Received ※ 08 June 2022 — Revised ※ 09 June 2022 — Accepted ※ 12 June 2022 — Issue date ※ 17 June 2022 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPOTK053 | RLAs with FFA Arcs for Protons and Electrons | 584 |
|
||
Funding: Authored in part by UT-Battelle, LLC, Jefferson Science Associates, LLC, and Brookhaven Science Associates, LLC under Contracts DE-AC05-00OR22725, DE-AC05-06OR23177, and DE-SC0012704 with the US DOE. Recirculating Linear Accelerators (RLAs) provide an efficient way of producing high-power, high-quality, continuous-wave hadron and lepton beams. However, their attractiveness had been limited by the cumbersomeness of multiple recirculating arcs and by the complexity of the spreader and recombiner regions. The latter problem sets one of the practical limitations on the maximum number of recirculations. We present an RLA design concept where the problem of multiple arcs is solved using the Fixed-Field Alternating gradient (FFA) design as in CBETA. The spreader/recombiner design is greatly simplified using an adiabatic matching approach. It allows for the spreader/recombiner function to be accomplished by a single beam line. The concept is applied to the designs of a high-power hadron accelerator being considered at ORNL and a CEBAF electron energy doubling project, FFA@CEBAF, being developed at Jefferson lab. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-MOPOTK053 | |
About • | Received ※ 10 June 2022 — Revised ※ 13 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 21 June 2022 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEIXGD1 | EIC Beam Dynamics Challenges | 1576 |
|
||
The Electron Ion Collider aims to produce luminosities of 1034 cm-2s-1 . The machine will operate over a broad range of collision energies with highly polarized beams. The coexistence of highly radiative electrons and nonradiative ions produce a host of unique effects. Strong hadron cooling will be employed for the final factor of 3 luminosity boost. | ||
![]() |
Slides WEIXGD1 [3.952 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEIXGD1 | |
About • | Received ※ 06 June 2022 — Revised ※ 13 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 14 June 2022 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPOPT044 | Electron-Ion Collider Design Status | 1954 |
|
||
Funding: Work supported under Contract No. DE-SC0012704, Contract No. DE-AC05-06OR23177, Contract No. DE-AC05-00OR22725, and Contract No. DE-AC02-76SF00515 with the U.S. Department of Energy. The Electron-Ion Collider (EIC) is being designed for construction at Brookhaven National Laboratory. Activities have been focused on beam-beam simulations, polarization studies, and beam dynamics, as well as on maturing the layout and lattice design of the constituent accelerators and the interaction region. The latest design advances will be presented. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOPT044 | |
About • | Received ※ 03 June 2022 — Revised ※ 14 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 03 July 2022 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPOST023 | Current Status of the FFA@CEBAF Energy Upgrade Study | 2494 |
|
||
Funding: This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics under contract DE-AC05-06OR23177. This work will describe the current status of the FFA@CEBAF energy upgrade feasibility studies. Technical updates are given, but more specific details are left to separate contributions. Specifically, this work will discuss improvements to the FFA arcs, a new recirculating injector proposal, and numerous modifications to the current 12 GeV CEBAF which will be required, such as the spreaders and recombiners architecture, splitters (time-of-flight chicanes), the extraction system, and the hall lines. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-THPOST023 | |
About • | Received ※ 08 June 2022 — Revised ※ 15 June 2022 — Accepted ※ 17 June 2022 — Issue date ※ 06 July 2022 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |