MOPOST006 Beam Commissioning and Optimisation in the CERN Proton Synchrotron After the Upgrade of the LHC Injectors 54
 
  • A. Huschauer, M.R. Coly, D.G. Cotte, H. Damerau, M. Delrieux, J.-C. Dumont, Y. Dutheil, S.E.R. Easton, M.A. Fraser, O. Hans, G.I. Imesch, S. Joly, A. Lasheen, C.L. Lombard, R. Maillet, B. Mikulec, J.-M. Nonglaton, S. Sainz Perez, B. Salvant, R. Suykerbuyk, F. Tecker, R. Valera Teruel
    CERN, Meyrin, Switzerland
 
  The CERN LHC injector chain underwent a major upgrade during the Long Shutdown 2 (LS2) in the framework of the LHC Injectors Upgrade (LIU) project. After 2 years of installation work, the Proton Synchrotron (PS) was restarted in 2021 with the goal to achieve pre-LS2 beam quality by the end of 2021. This contribution details the main beam commissioning milestones, encountered difficulties and lessons learned. The status of the fixed-target and LHC beams will be given and improvements in terms of performance, controls and tools described.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-MOPOST006  
About • Received ※ 01 June 2022 — Revised ※ 14 June 2022 — Accepted ※ 15 June 2022 — Issue date ※ 02 July 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPOST007 Summary of the First Fully Operational Run of LINAC4 at CERN 58
 
  • P.K. Skowroński, G. Bellodi, B. Bielawski, R.B. Borner, G.P. Di Giovanni, E. Gousiou, J.-B. Lallement, A.M. Lombardi, B. Mikulec, J. Parra-Lopez, F. Roncarolo, J.L. Sanchez Alvarez, R. Scrivens, L. Timeo, R. Wegner
    CERN, Meyrin, Switzerland
 
  In December 2020 the newly commissioned LINAC4 started delivering beam for the CERN proton accelerator chain, replacing the old LINAC2. LINAC4 is a 352 MHz normal conducting linac, providing a beam of negative hydrogen ions at 160 MeV that are converted into protons at injection into the PS Booster synchrotron. In this paper we report on the achieved beam performance, availability, reproducibility and other operational aspects of LINAC4 during its first fully operational year. We also present the machine developments performed and the plans for future improvements.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-MOPOST007  
About • Received ※ 09 June 2022 — Revised ※ 10 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 04 July 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEIYGD1 Achievements and Performance Prospects of the Upgraded LHC Injectors 1610
 
  • V. Kain, S.C.P. Albright, R. Alemany-Fernández, M.E. Angoletta, F. Antoniou, T. Argyropoulos, F. Asvesta, B. Balhan, M.J. Barnes, D. Barrientos, H. Bartosik, P. Baudrenghien, G. Bellodi, N. Biancacci, A. Boccardi, J.C.C.M. Borburgh, C. Bracco, E. Carlier, D.G. Cotte, J. Coupard, H. Damerau, G.P. Di Giovanni, A. Findlay, M.A. Fraser, A. Funken, B. Goddard, G. Hagmann, K. Hanke, A. Huschauer, M. Jaussi, I. Karpov, T. Koevener, D. Küchler, J.-B. Lallement, A. Lasheen, T.E. Levens, K.S.B. Li, A.M. Lombardi, N. Madysa, E. Mahner, M. Meddahi, L. Mether, B. Mikulec, J.C. Molendijk, E. Montesinos, D. Nisbet, F.-X. Nuiry, G. Papotti, K. Paraschou, F. Pedrosa, T. Prebibaj, S. Prodon, D. Quartullo, E. Renner, F. Roncarolo, G. Rumolo, B. Salvant, M. Schenk, R. Scrivens, E.N. Shaposhnikova, P.K. Skowroński, A. Spierer, F. Tecker, D. Valuch, F.M. Velotti, R. Wegner, C. Zannini
    CERN, Meyrin, Switzerland
 
  To provide HL-LHC performance, the CERN LHC injector chain underwent a major upgrade during an almost 2-year-long shutdown. In the first half of 2021 the injectors were gradually re-started with the aim to reach at least pre-shutdown parameters for LHC as well as for fixed target beams. The strategy of the commissioning across the complex, a summary of the many challenges and finally the achievements will be presented. Several lessons were learned and have been integrated to define the strategy for the performance ramp-up over the coming years. Remaining limitations and prospects for LHC beam parameters at the exit of the LHC injector chain in the years to come will be discussed. Finally, the emerging need for improved operability of the CERN complex will be addressed, with a description of the first efforts to meet the availability and flexibility requirements of the HL-LHC era while at the same time maximizing fixed target physics output.  
slides icon Slides WEIYGD1 [5.905 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEIYGD1  
About • Received ※ 08 June 2022 — Accepted ※ 15 June 2022 — Issue date ※ 09 July 2022  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPOTK046 Improved Longitudinal Performance of the LHC Beam in the CERN PS 2165
 
  • H. Damerau, V.D. Desquiens, A. Huschauer, A. Jibar, A. Lasheen, B. Mikulec, M. Morvillo, C. Rossi, B.J. Woolley
    CERN, Meyrin, Switzerland
 
  At the end of the 2018 run the intensity target for the High-Luminosity LHC (HL-LHC) had just been reached at extraction from the Proton Synchrotron (PS). In the framework of the LHC Injectors Upgrade (LIU) project additional RF improvements have been implemented during the 2019/2020 long shutdown (LS2), mainly impacting the impedance of the 10 MHz, 40 MHz, and 80 MHz RF systems. With the upgraded injection energy of 2 GeV (kinetic), also the intermediate plateau energy for RF manipulations has been increased. Following a campaign of beam studies throughout the 2021 run, a bunch intensity of up to 2.9·1011 p/b in trains of 72 bunches is achieved with the required longitudinal beam quality, surpassing the LIU target of 2.6·1011 p/b. The threshold of longitudinal quadrupolar coupled-bunch instabilities is increased during acceleration, but they are again observed at the flat-top. While dipolar coupled-bunch oscillations are well damped by a dedicated feedback system, the quadrupolar modes are suppressed by operating a 40 MHz system as an active higher-harmonic Landau cavity. The main commissioning steps are outlined, together with the key contributions to the improved beam performance.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOTK046  