BiBTeX citation export for MOPOST006: Beam Commissioning and Optimisation in the CERN Proton Synchrotron After the Upgrade of the LHC Injectors

@inproceedings{huschauer:ipac2022-mopost006,
  author       = {A. Huschauer and M.R. Coly and D.G. Cotte and H. Damerau and M. Delrieux and J.-C. Dumont and Y. Dutheil and S.E.R. Easton and M.A. Fraser and O. Hans and G.I. Imesch and S. Joly and A. Lasheen and C.L. Lombard and R. Maillet and B. Mikulec and J.-M. Nonglaton and S. Sainz Perez and B. Salvant and R. Suykerbuyk and F. Tecker and R. Valera Teruel},
% author       = {A. Huschauer and M.R. Coly and D.G. Cotte and H. Damerau and M. Delrieux and J.-C. Dumont and others},
% author       = {A. Huschauer and others},
  title        = {{Beam Commissioning and Optimisation in the CERN Proton Synchrotron After the Upgrade of the LHC Injectors}},
  booktitle    = {Proc. IPAC'22},
% booktitle    = {Proc. 13th International Particle Accelerator Conference (IPAC'22)},
  pages        = {54--57},
  eid          = {MOPOST006},
  language     = {english},
  keywords     = {MMI, vacuum, proton, operation, synchrotron},
  venue        = {Bangkok, Thailand},
  series       = {International Particle Accelerator Conference},
  number       = {13},
  publisher    = {JACoW Publishing, Geneva, Switzerland},
  month        = {07},
  year         = {2022},
  issn         = {2673-5490},
  isbn         = {978-3-95450-227-1},
  doi          = {10.18429/JACoW-IPAC2022-MOPOST006},
  url          = {https://jacow.org/ipac2022/papers/mopost006.pdf},
  abstract     = {{The CERN LHC injector chain underwent a major upgrade during the Long Shutdown 2 (LS2) in the framework of the LHC Injectors Upgrade (LIU) project. After 2 years of installation work, the Proton Synchrotron (PS) was restarted in 2021 with the goal to achieve pre-LS2 beam quality by the end of 2021. This contribution details the main beam commissioning milestones, encountered difficulties and lessons learned. The status of the fixed-target and LHC beams will be given and improvements in terms of performance, controls and tools described.}},
}