Paper | Title | Page |
---|---|---|
TUIYGD3 | FRIB Commissioning and Early Operations | 802 |
|
||
Funding: Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661. The Facility for Rare Isotope Beams (FRIB) project has completed technical construction in January 2022, five months ahead of schedule baselined about 10 years ago. Beam commissioning has been planned in seven phases starting from 2017 when the normal-conducting ion source and RFQ were commissioned. In April 2021, FRIB driver linac commissioning was completed with heavy ion beams being accelerated to energies above 200 MeV/u using 324 superconducting radiofrequency (SRF) resonators contained in 46 cryomodules. In preparation for high-power operations, a liquid lithium charge strip-per was used to strip uranium beam from average charge state of 33+ to 78+, and multiple charge states were accelerated simultaneously in the linac. By January 2022, FRIB target and fragment separator commissioning was completed with rare-isotope beams produced and identified. In May 2022, the first FRIB user scientific experiment was successfully conducted. This talk summarizes the FRIB accelerator project commissioning and early operations experience with discussions on strategic planning, operational envelope conformance, technical risk mitigation, and lessons learned. |
||
![]() |
Slides TUIYGD3 [23.483 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-TUIYGD3 | |
About • | Received ※ 07 June 2022 — Revised ※ 10 June 2022 — Accepted ※ 17 June 2022 — Issue date ※ 06 July 2022 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |