Author: Wu, B.
Paper Title Page
TUPAB261 The Ferrite Loaded Cavity Impedance Simulation 2070
 
  • L. Huang, X. Li, S. Wang, S.Y. Xu
    IHEP, Beijing, People’s Republic of China
  • B. Wu
    IHEP CSNS, Guangdong Province, People’s Republic of China
 
  Funding: Work supported by NNSF of China: N0. U1832210
The Rapid Cycling Synchrotron of the China Spallation Neutron Source is a high-intensity proton accelerator, it accumulates the 80 MeV proton beam and accelerates it to 1.6 GeV in 20 ms. The transverse coupling bunch instability is observed in beam commissioning. The source has been investigating from the commissioning. The RF acceleration system consists of eight ferrite-loaded cavities. The impedance is simulated and there is a narrow-band impedance of the ferrite cavity at about 17 MHz
 
poster icon Poster TUPAB261 [1.145 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB261  
About • paper received ※ 13 May 2021       paper accepted ※ 31 May 2021       issue date ※ 21 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)