Author: Pronskikh, V.S.
Paper Title Page
MOPAB190 An 8 GeV Linac as the Booster Replacement in the Fermilab Power Upgrade 643
 
  • D.V. Neuffer, S.A. Belomestnykh, M. Checchin, D.E. Johnson, S. Posen, E. Pozdeyev, V.S. Pronskikh, N. Solyak, V.P. Yakovlev
    Fermilab, Batavia, Illinois, USA
 
  Funding: This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics.
Increasing the Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Previously, rapid-cycling synchrotron (RCS) and Linac solutions were considered for this purpose. In this paper, we consider the Linac version that produces 8 GeV H beam for injection into the Recycler Ring (RR) or Main Injector (MI). The Linac takes ~1 GeV beam from the PIP-II Linac and accelerates it to ~2 GeV in a cw SRF linac, followed by a ~2-8 GeV pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in SRF technology. The linac configuration and beam dynamics requirements are presented. Injection options are discussed. Research needed to implement the Booster replacement is described.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB190  
About • paper received ※ 15 May 2021       paper accepted ※ 28 May 2021       issue date ※ 10 August 2021  