Author: Ollier, R.
Paper Title Page
MOPAB068 Collective Effects Studies for the SOLEIL Upgrade 274
 
  • A. Gamelin, D. Amorim, P. Brunelle, W. Foosang, A. Loulergue, L.S. Nadolski, R. Nagaoka, R. Ollier, M.-A. Tordeux
    SOLEIL, Gif-sur-Yvette, France
 
  The SOLEIL upgrade project aims to replace the actual SOLEIL storage ring by a 4th generation light source. The project has just finished its conceptual design report (CDR) phase*. Compared to the SOLEIL storage ring, the upgraded storage ring design includes many new features of 4th generation light sources that will impact collective effects, such as reduced beam pipe apertures, a smaller momentum compaction factor and the presence of harmonic cavities (HC). To mitigate them, we rely on several damping mechanisms provided by the synchrotron radiation, the transverse feedback system, and the HC (Landau damping and bunch lengthening). This article presents a first estimate of the collective effects impact of the upgraded design.
* Conceptual Design Report: Synchrotron SOLEIL Upgrade, 2021, in press.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB068  
About • paper received ※ 17 May 2021       paper accepted ※ 02 June 2021       issue date ※ 12 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAB054 CDR BASELINE LATTICE FOR THE UPGRADE OF SOLEIL 1485
 
  • A. Loulergue, D. Amorim, P. Brunelle, A. Gamelin, A. Nadji, L.S. Nadolski, R. Nagaoka, R. Ollier, M.-A. Tordeux
    SOLEIL, Gif-sur-Yvette, France
 
  Previous MBA studies converged toward a lattice composed of 20 7BA solution elaborated by adopting the sextupole pairing scheme with dispersion bumps originally developed at the ESRF-EBS. It provided a low natural horizontal emittance value of 70-80 pm-rad range at an energy of 2.75 GeV. Due to difficulties to accommodate such lattice geometry in the SOLEIL present tunnel as well as to preserve at best the beamline positioning, alternative lattice based on HOA (Higher-Order Achromat) type cell has been recently investigated. The HOA type cell being more modular and possibly exhibiting larger momentum acceptance as well as low emittances, a solution alternating 7BA and 4BA cells was then identified as the best to adapt the current beamline positioning. The SOLEIL CDR upgrade reference lattice is then composed of 20 HOA cells alternating 7BA and 4BA giving a natural horizontal emittance of 80 pm-rad. The linear and non-linear beam dynamic properties of the lattice along with the possibility of horizontal off-axis injection at full betatron coupling are presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB054  
About • paper received ※ 21 May 2021       paper accepted ※ 02 July 2021       issue date ※ 10 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPAB353 Design and Commissioning of a Multipole Injection Kicker for the SOLEIL Storage Ring 3525
 
  • R. Ollier, P. Alexandre, R. Ben El Fekih, L.S. Nadolski
    SOLEIL, Gif-sur-Yvette, France
 
  In third-generation synchrotron light sources, achieving an orbit distortion below 10% of the stored beam size is very challenging. The standard injection scheme of SOLEIL is made of 2 septa and 4 kicker magnets installed in a 12 m long straight section. Tuning the 4 kickers, to reduce perturbations, revealed to be almost impossible since it requires having 4 identical magnets, electronics, and Ti coated ceramic chambers. To reach the position stability requirement of the stored beam, a single pulsed magnet with no field on the stored beam path can replace the 4 kickers. Such a device, called MIK (Multipole Injection Kicker), was developed by SOLEIL and successfully commissioned in the MAX-IV 3-GeV ring as the key device used in the standard injection scheme for user operation, reducing the beam orbit distortion below 1 micron in peak value in both planes. A copy of the MIK has been installed in a short straight section of the SOLEIL storage ring, in January 2021. We report MIK positioning studies, the constraints of the project, sapphire chamber coating challenges and the first commissioning results. The R&D MIK is a demonstrator for the injection scheme of SOLEIL upgrade as well.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-WEPAB353  
About • paper received ※ 21 May 2021       paper accepted ※ 23 July 2021       issue date ※ 31 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)