Paper | Title | Page |
---|---|---|
WEXA04 | The RCS Design Status for the Electron Ion Collider | 2521 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. The design of the Electron-Ion Collider Rapid Cycling Synchrotron (RCS) to be constructed at Brookhaven National Laboratory is advancing to meet the injection requirements for the Electron Storage Ring (ESR). Over the past year activities are focused on developing the approach to inject two 28 nC bunches every second, up from the original design of one 10nC bunch every second. The solution requires several key changes concerning the injection and extraction kickers, charge accumulation via bunch merging and a carefully calibrated RF acceleration profile to match the longitudinal emittance required by the ESR. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-WEXA04 | |
About • | paper received ※ 19 May 2021 paper accepted ※ 31 August 2021 issue date ※ 10 August 2021 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |