Paper |
Title |
Page |
TUPAB284 |
BPM for the High Energy Beam Transport Line of MINERVA Project at SCK•CEN |
2143 |
|
- H. Kraft, L. Perrot
Université Paris-Saclay, CNRS/IN2P3, IJCLab, Orsay, France
|
|
|
This paper presents the status of developments concerning button type BPM. Results of our analytical model BPMOK will compare the measurements done at IPHI facility at CEA-Saclay and GANIL/SPIRAL2 in Caen. The measurements aims to compare the response of the analytical model depending on beam positions, sizes, intensities and energies. BPMOK is validated to predict BPM responses in order to make parametric studies. Starting from already existing BPM built for the MINERVA LINAC, the analytical model is used to design the BPM for the HEBT.
|
|
|
Poster TUPAB284 [1.475 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB284
|
|
About • |
paper received ※ 10 May 2021 paper accepted ※ 02 June 2021 issue date ※ 28 August 2021 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|