Deployment and Commissioning of the CERN PS Injection Kicker System for Operation with 2 GeV Beams in Short Circuit Mode |
4489 |
|
- T. Kramer, N. Ayala, J.C.C.M. Borburgh, P.A.H. Burkel, E. Carlier, L. Ducimetière, L.M.C. Feliciano, A. Ferrero Colomo, M.A. Fraser, L.A. Govertsen, R. Noulibos, S. Pavis, L. Sermeus
CERN, Geneva, Switzerland
|
|
|
Within the framework of the LHC Injector Upgrade (LIU) project, the feasibility and design of an upgrade of the existing CERN PS proton injection kicker system have been outlined in previous publications already. This paper describes the adjustments of final design choices, testing, and deployment as well as the validation and commissioning of the new 2 GeV injection kicker system. The upgrade pays particular attention to the reduction of pulse reflections unavoidably induced by a magnet in short circuit mode configuration whilst keeping a fast 104 ns rise and fall time. An adapted thyratron triggering system to reduce jitter and enhance thyratron lifetime is outlined. Additionally, improvements to the magnet entry box and the elimination of SF6 gas in the magnet connection box and the associated pulse transmission lines are discussed.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-THPAB354
|
|
About • |
paper received ※ 19 May 2021 paper accepted ※ 14 July 2021 issue date ※ 10 August 2021 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|