Paper |
Title |
Page |
MOPAB272 |
Consideration the Prospects of Beam Diagnostic System Upgrade in the Transport Channels of Injection Complex VEPP-5 |
860 |
|
- K.V. Astrelina, F.A. Emanov
BINP SB RAS, Novosibirsk, Russia
- F.A. Emanov
NSU, Novosibirsk, Russia
|
|
|
Transport electron and positron channels from linear accelerator to storage ring of Injection Complex VEPP-5 (BINP, Novosibirsk) have complicated 3D configuration and equipped only with luminophore screens as a beam test. For the regular machine operations the non-destructive beam diagnostic system is required to adjust the electron and positron beam trajectories and minimize the beam losses. The proposal of new beam position monitors (BPM) assembling is considered. Newly added BPMs allow one to control the beam trajectory during operations. Collecting beam position data in several points makes it possible to calculate and correct the beamline parameters: Twiss parameters, dispersion, beam energy variations. The possible configuration of the new BPMs placing is suggested and the rate of beam loss reducing due the additional diagnostics is estimated.
|
|
|
Poster MOPAB272 [1.164 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB272
|
|
About • |
paper received ※ 20 May 2021 paper accepted ※ 02 June 2021 issue date ※ 02 September 2021 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPAB021 |
Status of VEPP-5 Injection Complex |
3796 |
|
- F.A. Emanov, A.V. Andrianov, K.V. Astrelina, V.V. Balakin, A.M. Barnyakov, A.M. Batrakov, O.V. Belikov, D.E. Berkaev, Y.M. Boimelshtain, D. Bolkhovityanov, A. Butakov, A.R. Frolov, G.V. Karpov, A.S. Kasaev, A.A. Kondakov, N.Kh. Kot, E.S. Kotov, G.Y. Kurkin, R.M. Lapik, N.N. Lebedev, A.E. Levichev, Yu.I. Maltseva, P.V. Martyshkin, S.V. Motygin, A.A. Murasev, V. Muslivets, D.A. Nikiforov, A.V. Pavlenko, A.M. Pilan, Yu.A. Rogovsky, S.L. Samoylov, A.G. Tribendis, S. Vasiliev, V.D. Yudin
BINP SB RAS, Novosibirsk, Russia
|
|
|
VEPP-5 injection complex is being put into operation as beam source of VEPP-2000 and VEPP-4 colliders at the end of 2016. Since then injection complex demonstrated maximum positron storage rate 1.7·1010 e+/s and stable operation at the energy of 430 MeV. Latest operation results and prospects are presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-THPAB021
|
|
About • |
paper received ※ 20 May 2021 paper accepted ※ 27 July 2021 issue date ※ 27 August 2021 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|