Author: Dettinger, T.
Paper Title Page
MOPAB208 LLRF Measurements and Cu-plating at the First-of-Series Cavity Section of the Alvarez 2.0 at GSI 686
 
  • M. Heilmann, T. Dettinger, X. Du, L. Groening, S. Mickat, A. Rubin
    GSI, Darmstadt, Germany
 
  The Alvarez 2.0 will replace the existing post-stripper DTL of the GSI UNILAC. Today’s GSI comprises the UNILAC and the synchrotron SIS18 and is going to serve as the injector chain for the Facility of Antiproton and Ion Research (FAIR). The new Alvarez-type DTL is operated at 108.4 MHz providing acceleration from 1.4 MeV/u to 11.4 MeV/u along a total length of 55 meters. The first-of-series (FoS) cavity section has 12 RF-gaps along a total length of 1.9 m. It is the first cavity section of the new DTL. All main components were delivered in 2019, followed by successful SAT and installation of the 11 drift tubes and copper-plating. Completion of first low level RF-measurements prior to copper plating and the subsequent plating are major project milestones. These proceedings report on the results and compares them to simulation using CST Microwave Studio.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB208  
About • paper received ※ 18 May 2021       paper accepted ※ 31 May 2021       issue date ※ 22 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)