Author: Chen, J.
Paper Title Page
MOPAB075 Proposal of the Southern Advanced Photon Source and Current Physics Design Study 300
 
  • S. Wang, J. Chen, L. Huang, Y. Jiao, B. Li, Z.P. Li, W. Liu, S.Y. Xu
    IHEP, Beijing, People’s Republic of China
  • Y. Han, X.H. Lu, Y. Zhao
    IHEP CSNS, Guangdong Province, People’s Republic of China
  • X. Liu
    Department of Energy Sciences, Tokyo Institute of Technology, Yokohama, Japan
 
  It has been considered to build a mid-energy fourth-generation storage ring light source neighbouring the China Spallation Neutron Source, in Guangdong Province, the south of China. The light source is named the Southern Advanced Photon Source (SAPS). Preliminary physics design studies on the SAPS have been implemented for a few years. In this paper, we will describe considerations of technical roadmap and key parameter choice for this light source, and introduce the up-to-date lattice designs and related physics studies on the SAPS.  
poster icon Poster MOPAB075 [1.689 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB075  
About • paper received ※ 12 May 2021       paper accepted ※ 20 May 2021       issue date ※ 21 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAB192 Studies on Momentum Collimation for CSNS-RCS Upgrades 1855
 
  • Y.W. An, J. Chen, S.Y. Xu, Y. Yuan
    IHEP, Beijing, People’s Republic of China
  • X.H. Lu, J.B. Yu
    IHEP CSNS, Guangdong Province, People’s Republic of China
 
  The CSNS project was a high intensity pulsed facility, and achieved the the design goal of 100kW in 2020. The upgrades of the CSNS are proposed, and the momentum collimator is a component of the upgrades. This paper will show the design scheme of the momentum collimator and the simulation results are also presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB192  
About • paper received ※ 18 May 2021       paper accepted ※ 15 June 2021       issue date ※ 28 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAB196 Achievement of 100-kW Beam Operation in CSNS/RCS 1869
 
  • S.Y. Xu, Y.W. An, J. Chen, L. Huang, M.Y. Huang, Y. Li, S. Wang
    IHEP, Beijing, People’s Republic of China
  • H.Y. Liu, X.H. Lu
    IHEP CSNS, Guangdong Province, People’s Republic of China
 
  The China Spallation Neutron Source (CSNS) is an accelerator-based science facility. CSNS is designed to accelerate proton beam pulses to 1.6 GeV kinetic energy, striking a solid metal target to produce spallation neutrons. CSNS has two major accelerator systems, a linear accelerator (80 MeV Linac) and a 1.6 GeV rapid cycling synchrotron(RCS). The RCS accumulates and accelerates the proton beam to 1.6 GeV and then extracts the beam to the target at the repetition rate of 25 Hz. The Beam commissioning of CSNS/RCS had been started since April 2017. The most important issue in high-power beam commissioning is the beam loss control, as well as the control of induced activities, to meet the requirement of manual maintenance. A series of beam loss optimization work had been done to reduce the uncontrolled beam loss. At the end of February 2020, the CSNS reached the design beam power of 100 kW with very low uncontrolled beam loss.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB196  
About • paper received ※ 19 May 2021       paper accepted ※ 31 May 2021       issue date ※ 28 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPAB104 Magnetic Error Effects of the Storage Ring for the Southern Advanced Photon Source 3980
 
  • J. Chen, Y. Jiao, X. Liu, S. Wang
    IHEP, Beijing, People’s Republic of China
  • Y. Zhao
    IHEP CSNS, Guangdong Province, People’s Republic of China
 
  There are various magnetic errors in the actual accelerator, which will significantly affect the beam quality and machine performance. The diffraction-limited storage ring (DLSR) of Southern Advanced Photon Source (SAPS) will use a large number of ultra-high gradient quadrupoles and sextupoles, which, in turn, leads to the tight tolerance of beam parameters to magnetic errors. Based on a preliminary designed storage ring lattice of the SAPS, the influence of various magnetic errors on lattice parameters has been evaluated.  
poster icon Poster THPAB104 [0.588 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-THPAB104  
About • paper received ※ 17 May 2021       paper accepted ※ 23 June 2021       issue date ※ 18 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPAB224 The Correction of Time-Dependent Tune Shift by Harmonic Injection 4234
 
  • X.H. Lu
    IHEP CSNS, Guangdong Province, People’s Republic of China
  • J. Chen, S. Wang, S.Y. Xu
    IHEP, Beijing, People’s Republic of China
 
  In the Rapid Cycling Synchrotron(RCS) of China Spallation Neutron Source(CSNS), transverse painting injection is employed to suppress the space-charge effects. The beta-beating caused by edge focusing of the injection bump magnets leads to tune shift. A new method based on the harmonic injection is firstly introduced to correct the time-dependent tune shift caused by the edge focusing effect of the chicane bump magnets in RCS. The simulation study was done on the application of the new method to the CSNS/RCS, and the results show the validity and effectiveness of the method.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-THPAB224  
About • paper received ※ 19 May 2021       paper accepted ※ 16 July 2021       issue date ※ 10 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)