Author: Calvey, J.R.
Paper Title Page
MOPAB044 Gas Bremsstrahlung Measurements in the Advanced Photon Source Storage Ring 193
 
  • J.C. Dooling, A.R. Brill, J.R. Calvey
    ANL, Lemont, Illinois, USA
 
  Funding: Work supported by the U.S. D.O.E.,Office of Science, Office of Basic Energy Sciences, under contract number DE-AC02- 06CH11357.
In the Advanced Photon Source Upgrade storage ring (SR), small-aperture vacuum chambers provide limited conductance for pumping. Non-evaporable getter (NEG) coatings will be used in the SR to support the vacuum. Ion pumps and cold-cathode gauges are typically located away from the vacuum chamber transporting the beam. Measuring gas bremsstrahlung (GB) photons in low-conductance chambers provides a method to determine the pressure at the beam location. We report on GB measurements made in the ID-25 beamline. A Pb:Glass calorimeter radiator generates Cherenkov radiation when high-energy photons cause pair-production within the glass. A photomultiplier tube converts the light pulses to electrical signals. Data was obtained during normal machine operations starting in January 2020. Data collection was facilitated using a 4-channel ITech Beam Loss Monitor FPGA that allows for control of thresholds and attenuation settings in both counting and pulse-height acquisition modes. Count rates and spectra were recorded for the three primary fill patterns typically used during SR operations as well as during gas injection experiments; results of these measurements will be presented.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB044  
About • paper received ※ 22 May 2021       paper accepted ※ 28 May 2021       issue date ※ 25 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPAB045 Measurements and Simulations of High Charge Beam in the APS Booster 197
 
  • J.R. Calvey, J.C. Dooling, K.C. Harkay, K.P. Wootton, C. Yao
    ANL, Lemont, Illinois, USA
 
  For the APS-Upgrade, swap-out injection will require the booster to support up to 17 nC bunch charge, several times what is used in the present APS. Booster injection efficiency drops sharply at high charge, and is the present bottleneck limiting high charge transport through the injectors. Particle tracking simulations have been used to understand what causes are limiting the injection efficiency, and to guide plans for improving it. In particular, bunch length blowup in the injected beam and beam loading in the RF cavities have been identified as the biggest factors. Simulations and measurements have also been done to characterize beam properties along the booster energy ramp. So far, a bunch charge of 12 nC has been successfully extracted from the booster.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB045  
About • paper received ※ 19 May 2021       paper accepted ※ 26 July 2021       issue date ※ 16 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPAB046 Plan for Operating the APS-Upgrade Booster with a Frequency Sweep 201
 
  • J.R. Calvey, T.G. Berenc, A.R. Brill, L. Emery, T. Fors, K.C. Harkay, T.J. Madden, N. Sereno, U. Wienands
    ANL, Lemont, Illinois, USA
  • A. Gu
    UCB, Berkeley, California, USA
 
  The APS-Upgrade presents several challenging demands to the booster synchrotron. Swap-out injection requires the booster to capture a high charge bunch (up to 17 nC), accelerate it to 6 GeV, and maintain a low emittance at extraction for injection into the storage ring. To accommodate these conflicting demands, the RF frequency will be ramped between injection and extraction. However, the RF cavity tuners will remain static, which means the couplers will need to withstand a high reflected power at extraction. This paper presents a plan for a system that will meet the requirements for injection efficiency, extracted emittance, and equivalent power at the coupler. Results from tracking simulations and beam studies with a frequency ramp will also be shown.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB046  
About • paper received ※ 28 May 2021       paper accepted ※ 02 June 2021       issue date ※ 26 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPAB123 Radiation Safety Considerations For The APS Upgrade Injector 445
 
  • K.C. Harkay, J.R. Calvey, S. Chitra, G.I. Fystro, M.J. Henry, E.E. Heyeck, B.J. Micklich, K.P. Wootton
    ANL, Lemont, Illinois, USA
 
  Funding: Work supported by U. S. Department of Energy, Office of Science, under Contract No. DE-AC02-06CH11357.
The Advanced Photon Source Upgrade (APS-U) is a high-performance fourth-generation storage ring light source based on multibend achromat optics. As such, APS-U will require on-axis injection. The injectors will need to supply full-current bunch replacement in the ring; therefore, the injected bunch charge will be up to five times higher than what is typical for APS. A program was conducted to measure the radiation dose above the injector transport line to the APS storage ring for both normal operation conditions and controlled loss scenarios. Standard survey meters were used to record the dose. A review of the dose data identified opportunities to minimize the potential dose under normal APS-U high charge operation and fault conditions; these include improving the supplemental shielding and adding engineered controls. In addition, the dose data provide a benchmark for evaluating new radiation monitors for APS-U.
 
poster icon Poster MOPAB123 [1.317 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB123  
About • paper received ※ 18 May 2021       paper accepted ※ 24 May 2021       issue date ※ 12 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPAB124 APS Booster Injection Horizontal Trajectory Control Upgrade 449
 
  • C. Yao, J.R. Calvey, G.I. Fystro, A.F. Pietryla, H. Shang
    ANL, Lemont, Illinois, USA
 
  Funding: * Work supported by the U.S. Department of Energy, Office of Science, under Contract No. DE-ACO2-O6CH11357.
The APS booster is a 7-GeV electron synchrotron with a 0.5-second cycle. The booster runs a set of injection control programs that correct the beam trajectory in the horizontal and longitudinal planes, and the betatron tunes. Recently we developed a single-turn BPM controllaw program for horizontal trajectory control to replace the previous FFT based horizontal controllaw program. We present the system configuration and results.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB124  
About • paper received ※ 15 May 2021       paper accepted ※ 27 May 2021       issue date ※ 21 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUXA01 Advances in Understanding of Ion Effects in Electron Storage Rings 1267
 
  • J.R. Calvey, M. Borland, T.K. Clute, J.C. Dooling, L. Emery, J. Gagliano, J.E. Hoyt, P.S. Kallakuri
    ANL, Lemont, Illinois, USA
 
  Ion instability, in which beam motion couples with trapped ions in an accelerator, is a serious concern for high-brightness electron storage rings. For the APS-Upgrade, we plan to mitigate coherent ion instability using a compensated gap scheme. To study incoherent effects (such as emittance growth), an IONEFFECTS element has been incorporated into the particle tracking code ELEGANT. The simulations include multiple ionization, transverse impedance, and charge variation between bunches. Once these effects are included, the simulations show good agreement with measurements at the present APS. We have also installed a gas injection system, which creates a controlled pressure bump of Nitrogen gas in a short section of the APS ring. The resulting ion instability was studied under a wide variety of beam conditions. For cases with no or insufficient train gaps, large emittance growth was observed. IONEFFECTS simulations of the gas injection experiment and APS-U storage ring show the possibility of runaway emittance blowup, where the blown-up beam traps more ions, driving further instability.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUXA01  
About • paper received ※ 24 June 2021       paper accepted ※ 27 July 2021       issue date ※ 10 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)