Feasibility Study for the Novel CERN PS Fast Extraction Septum |
2363 |
|
- T. Helseth, M.G. Atanasov, B. Balhan, J.C.C.M. Borburgh, L. Ducimetière, M.A. Fraser, T. Kramer
CERN, Geneva, Switzerland
|
|
|
In the framework of accelerator consolidation, a feasibility study for a novel CERN PS extraction septum has been conducted. Functional requirements have been established and, accordingly, a system of two septa magnets and their associated pulse generator is proposed. The magnetic septum design is based on eddy current topology. Magnetic simulations in Flux 2D and Opera 3D of a conceptual design have been carried out. The short length and high amplitude of the current pulse required to drive the eddy current septa imply that none of the power converters currently used for septa magnets at CERN will be suitable. Pulse generator topologies derived from kicker generators have therefore been explored and simulated in Spice. The conceptual magnet and generator design along with simulation results are presented in this paper.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB363
|
|
About • |
paper received ※ 18 May 2021 paper accepted ※ 17 June 2021 issue date ※ 10 August 2021 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPAB354 |
Deployment and Commissioning of the CERN PS Injection Kicker System for Operation with 2 GeV Beams in Short Circuit Mode |
4489 |
|
- T. Kramer, N. Ayala, J.C.C.M. Borburgh, P.A.H. Burkel, E. Carlier, L. Ducimetière, L.M.C. Feliciano, A. Ferrero Colomo, M.A. Fraser, L.A. Govertsen, R. Noulibos, S. Pavis, L. Sermeus
CERN, Geneva, Switzerland
|
|
|
Within the framework of the LHC Injector Upgrade (LIU) project, the feasibility and design of an upgrade of the existing CERN PS proton injection kicker system have been outlined in previous publications already. This paper describes the adjustments of final design choices, testing, and deployment as well as the validation and commissioning of the new 2 GeV injection kicker system. The upgrade pays particular attention to the reduction of pulse reflections unavoidably induced by a magnet in short circuit mode configuration whilst keeping a fast 104 ns rise and fall time. An adapted thyratron triggering system to reduce jitter and enhance thyratron lifetime is outlined. Additionally, improvements to the magnet entry box and the elimination of SF6 gas in the magnet connection box and the associated pulse transmission lines are discussed.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-THPAB354
|
|
About • |
paper received ※ 19 May 2021 paper accepted ※ 14 July 2021 issue date ※ 10 August 2021 |
|