Author: Astrelina, K.V.
Paper Title Page
MOPAB272 Consideration the Prospects of Beam Diagnostic System Upgrade in the Transport Channels of Injection Complex VEPP-5 860
 
  • K.V. Astrelina, F.A. Emanov
    BINP SB RAS, Novosibirsk, Russia
  • F.A. Emanov
    NSU, Novosibirsk, Russia
 
  Transport electron and positron channels from linear accelerator to storage ring of Injection Complex VEPP-5 (BINP, Novosibirsk) have complicated 3D configuration and equipped only with luminophore screens as a beam test. For the regular machine operations the non-destructive beam diagnostic system is required to adjust the electron and positron beam trajectories and minimize the beam losses. The proposal of new beam position monitors (BPM) assembling is considered. Newly added BPMs allow one to control the beam trajectory during operations. Collecting beam position data in several points makes it possible to calculate and correct the beamline parameters: Twiss parameters, dispersion, beam energy variations. The possible configuration of the new BPMs placing is suggested and the rate of beam loss reducing due the additional diagnostics is estimated.  
poster icon Poster MOPAB272 [1.164 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB272  
About • paper received ※ 20 May 2021       paper accepted ※ 02 June 2021       issue date ※ 02 September 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPAB021 Status of VEPP-5 Injection Complex 3796
 
  • F.A. Emanov, A.V. Andrianov, K.V. Astrelina, V.V. Balakin, A.M. Barnyakov, A.M. Batrakov, O.V. Belikov, D.E. Berkaev, Y.M. Boimelshtain, D. Bolkhovityanov, A. Butakov, A.R. Frolov, G.V. Karpov, A.S. Kasaev, A.A. Kondakov, N.Kh. Kot, E.S. Kotov, G.Y. Kurkin, R.M. Lapik, N.N. Lebedev, A.E. Levichev, Yu.I. Maltseva, P.V. Martyshkin, S.V. Motygin, A.A. Murasev, V. Muslivets, D.A. Nikiforov, A.V. Pavlenko, A.M. Pilan, Yu.A. Rogovsky, S.L. Samoylov, A.G. Tribendis, S. Vasiliev, V.D. Yudin
    BINP SB RAS, Novosibirsk, Russia
 
  VEPP-5 injection complex is being put into operation as beam source of VEPP-2000 and VEPP-4 colliders at the end of 2016. Since then injection complex demonstrated maximum positron storage rate 1.7·1010 e+/s and stable operation at the energy of 430 MeV. Latest operation results and prospects are presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-THPAB021  
About • paper received ※ 20 May 2021       paper accepted ※ 27 July 2021       issue date ※ 27 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)