Author: Alacakir, A.
Paper Title Page
MOPAB209 Commissioning of SANAEM RFQ Accelerator 690
 
  • B. Yasatekin, A. Alacakir, A.S. Bolukdemir, I. Kilic, Y. Olgac
    TENMAK-NUKEN, Ankara, Turkey
  • E. Cicek
    KEK, Ibaraki, Japan
  • E. Cosgun
    UNIST, Ulsan, Republic of Korea
 
  The former SANAEM RFQ is upgraded with a newly manufactured cavity, made of oxygen-free copper (OFC), having the capability of accelerating protons from 20 keV to 1.3 MeV. In the assembling of cavity vanes, flanges, etc., indium wire is preferred over the brazing process providing a more flexible and easy method for vacuum sealing. After assembling the cavity, argon plasma cleaning is performed for the final cleaning and RF pre-conditioning. Vacuum tests revealed that levels of 2·10-7 mbar could be achieved quite easily. RF power conditioning of the RFQ cavity is successfully completed with the observation of quite few sparks. In the commissioning tests with the proton beam, a magnetic analyzer is used to measure the energy of the particles. This paper presents the strategy and the results concerning the commissioning of the proton beam with special emphasis on the RFQ cavity.  
poster icon Poster MOPAB209 [5.076 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB209  
About • paper received ※ 19 May 2021       paper accepted ※ 14 June 2021       issue date ※ 22 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)