Author: Wang, S.
Paper Title Page
MOZPLM1 Operation Status and Upgrade of CSNS 23
 
  • S. Fu, S. Wang
    IHEP, Beijing, People’s Republic of China
 
  China Spallation Neutron Source (CSNS) accelerator complex consists of a front end, an 80MeV DTL linac, and a 1.6GeV Rapid Cycling Synchrotron (RCS).It is designed with a beam power of 100kW in the first phase and reserves upgrade capability to 500kW in the second phase. It has completed initial beam commissioning and has started user operation in 2018. And meanwhile the beam power is quickly going up from the initially above 10kW to 50kW during the user operation, and we can foresee that the designed beam power of 100 kW can be reached in the next year. This talk gives the most recent status of beam power ramping in CSNS, as well as future upgrade plan to increase the beam power up to 500 kW.  
slides icon Slides MOZPLM1 [12.157 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOZPLM1  
About • paper received ※ 15 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPTS048 Preliminary Study on the Injection System Upgrade for CSNS-II 2037
 
  • S. Wang, M.Y. Huang, S.Y. Xu
    IHEP, Beijing, People’s Republic of China
 
  Funding: Work supported by National Natural Science Foundation of China (Project No. U1832210)
The first phase of the China Spallation Neutron Source (CSNS-I) had completed the national acceptance in August, 2018. The physics design of the second phase (CSNS-II) has already begun. The CSNS-II accelerator upgrade contains three main components, including the Linac energy upgrade from 80 MeV to 300 MeV, injection system upgrade, and new Magnetic Alloy dual-harmonic cavity. In this paper, a preliminary study on the injection system upgrade had been done. A preliminary upgrade scheme for the injection system would be given. Furthermore, some preliminary simulation and calculation for the upgrade injection system had been carried out. The analysis results showed that most injection parameters can preliminarily meet the requirements of accelerator power upgrade.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPTS048  
About • paper received ※ 15 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMP011 Residual Orbits Estimation of the Injection Painting Bumps for CSNS 2326
 
  • M.Y. Huang, S. Wang, S.Y. Xu
    IHEP, Beijing, People’s Republic of China
 
  Funding: Work supported by National Natural Science Foundation of China (Project No. U1832210)
There are three bumps (one chicane bump and two painting bumps) in the injection system of the China Spallation Neutron Source (CSNS). They are the core parts of the injection system and the important guarantee that the Linac beam injecting into the rapid cycling synchrotron (RCS). During the beam commissioning, to check the effect of the residual orbits of the three bumps in the injection region was an important problem. In this paper, the residual orbits of BH and BV painting bumps were studied and estimated in the beam commissioning. The data analysis results showed that the residual orbits of BH and BV painting bumps were very small and they didn’t need to be corrected.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPMP011  
About • paper received ※ 01 May 2019       paper accepted ※ 20 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMP012 Beam Loss and the Stripping Efficiency Measurement for CSNS Injection System 2329
 
  • M.Y. Huang, S. Wang, S.Y. Xu
    IHEP, Beijing, People’s Republic of China
 
  Funding: Work supported by National Natural Science Foundation of China (Project No. U1832210)
The injection beam loss is the main beam loss of the rapid cycling synchrotron (RCS) for the China Spallation Neutron Source (CSNS). After the optimization of injection system during the beam commissioning, the current injection beam loss for CSNS/RCS is approximately 1%. There are several sources of injection beam loss. In order to distinguish these different sources, the stripping efficiency of the main stripping foil should be studied and measured accurately. In this paper, a scheme for the accurate measurement of the stripping efficiency for CSNS will be proposed and studied. It can not only reduce the injection beam loss, but also be used to estimate the operation state and lifespan of the main stripping foil accurately. This method will be applied in future beam commissioning.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPMP012  
About • paper received ※ 30 April 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMP014 Slow Extraction Study by Using Sextupole 2332
 
  • L. Huang, S. Wang
    IHEP, Beijing, People’s Republic of China
 
  The spill continuously extracted from synchrotron by using resonance sextupoles plays a key role in multidisciplinary application. The intensity of virtual sextupole and the spiral step for the typical synchrotron are obtained theoretically. A customized synchrotron of extraction components placed in dispersion section is designed and the tracking code of slow extraction is developed, thus the theoretical spiral step is comparative studied. To study the beam loss, three layouts of extraction are also designed based on the synchrotron. The result shows that the beam losses at extraction point are different for three cases and it is advantage to beam loss for extraction components placed in dispersion-free straight section.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPMP014  
About • paper received ※ 15 May 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPTS029 The Synchronization between BPMs and Corrector Power Supplies in AC Mode of RCS of CSNS 3164
 
  • M.T. Li
    IHEP CSNS, Guangdong Province, People’s Republic of China
  • Y.W. An, S. Wang, S.Y. Xu
    IHEP, Beijing, People’s Republic of China
  • S.Y. Xu
    DNSC, Dongguan, People’s Republic of China
 
  This paper introduces our effort for synchronizing BPMs and Corrector Power Supplies in AC mode of RCS of CSNS. This work helps to increase the accuracy of the response matrix measurement, the obit correction, and other commissioning task.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPTS029  
About • paper received ※ 15 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)