MOPGW001 Design Review of Bellows RF-Shielding Types and New Concepts for Sirius 53
 
  • H.O.C. Duarte, P.P.S. Freitas, A.R.D. Rodrigues, R.M. Seraphim, T.M. da Rocha
    LNLS, Campinas, Brazil
 
  Large amounts of bellows in an accelerator justify the importance of simplifying the machining and assembling processes of their RF shield. Such quantity also makes this component one of the main contributors for a machine impedance budget. On the other hand, low impedance designs tend to complicate the mechanical aspects. Applied to Sirius round vacuum chamber of 24 mm inner diameter, the omega-strip and comb-type bellows concepts are compared with new proposed designs. In such comparison, the aforementioned aspects, wakefield losses and prototyping experiences are presented in this work.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPGW001  
About • paper received ※ 16 May 2019       paper accepted ※ 20 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPGW003 Sirius Status Update 1381
 
  • A.R.D. Rodrigues, F.C. Arroyo, J.F. Citadini, R.H.A. Farias, J.G.R.S. Franco, R. Junqueira Leão, L. Liu, S.R. Marques, R.T. Neuenschwander, C. Rodrigues, F. Rodrigues, R.M. Seraphim, O.H.V. Silva, F.H. de Sá
    LNLS, Campinas, Brazil
 
  Sirius is a 4th generation 3 GeV low emittance electron storage ring that is in its final installation phase at the Brazilian Center for Research in Energy and Materials (CNPEM) campus in Campinas, Brazil. Presently the injector installation is complete, and the storage ring installation is being finalized. Most subsystems are under test and tuning in real working conditions. Six beamlines are also under construction. In this paper we report on the Sirius main subsystems installation status.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPGW003  
About • paper received ※ 15 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS004 The Sirius Heating System for the In-situ NEG Activation 4109
 
  • P.H. Nallin, M. Bacchetti, F.G.R. Carrera, D.R. Cavalcante, R.O. Ferraz, P.P.S. Freitas, G.R. Gomes, J.G. Hidalgo, R.T. Neuenschwander, F.A.M. Pinto, A.R.D. Rodrigues, R.M. Seraphim
    LNLS, Campinas, Brazil
 
  Sirius is a 3 GeV fourth-generation synchrotron light source under commissioning in Brazil, with 518 m circumference and a bare lattice emittance of 0.25 nm.rad. This ultra-low emittance machine is based on approximately 700 magnets with 28 mm typical gap. The standard vacuum chamber, that makes up around 80% of the circumference, is a 26 mm external diameter copper tube. Due to the small conductance of the chambers and the limited space between the magnets, the vacuum pumping will be based on distributed concept and then non­-evaporable getter (NEG) coating will be extensively used. To activate the NEG coating, the chambers must be heated at 200°C for about 24 hours. The solution for Sirius was the development of an ultra-thin heating tape, 0.4 mm thick, which allows an in-situ bake-out. The developed tapes are able to operate continuously at 220°C and have in their design a thermal shield that reduces the radiation heat loss to the magnets. This paper describes the development of the heating tape, its power supply, the control software and the operation of the system during the NEG activation at Sirius.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS004  
About • paper received ※ 15 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)