Paper | Title | Page |
---|---|---|
MOPTS020 | Status of the FAIR Proton LINAC | 889 |
|
||
For the production of Antiproton beams with sufficient intensities, a dedicated high-intensity 325 MHz Proton linac is currently under construction. The Proton linac shall deliver a beam current of up to 70 mA with an energy of 68 MeV for injection into SIS18. The source is designed for the generation of 100 mA beams. The Low-Energy Beam Transport line (LEBT) contains two magnetic solenoid lenses enclosing a diagnostics chamber, a beam chopper and a beam conus. A ladder 4-Rod RFQ and six normal conducting crossbar cavities of CCH and CH type arranged in two sections accelerate the beam to the final energy of 68 MeV. The technical design of the DTL CH cavities are presented and the commissioning measurements of the ion source are described. The construction and the procurement progress, the design and testing results of the key hardware are presented. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS020 | |
About • | paper received ※ 14 May 2019 paper accepted ※ 23 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPTS032 | New Beam Dynamics Simulations for the FAIR p-Linac RFQ | 921 |
|
||
The construction of a 3.3m Ladder-RFQ at IAP*, Goethe University Frankfurt, has been finished successfully last summer. This RFQ is designed to accelerate protons from 95 keV to 3.0 MeV according to the design parameters of the p-Linac at FAIR**. Along the acceleration section the parameters modulation, aperture and synchronous phase are varied linearly with cell number, which differs from former designs from IAP Frankfurt. The ratio of transversal vane curvature radius to mid-cell radial aperture and the vane radius itself are constant. The development of an adequate beam dynamics design was done with the aid of the RFQGen-code and in close collaboration with the IAP resonator design team. The RFQ beam dynamics design could be successfully reproduced with the TOUTATIS-routine of CEAs*** TraceWin-code. Several new beam dynamics simulations were performed on the design. Among these were current and Twiss parameter studies as well as simulations concerned with the investigation of longitudinal entrance and exit gap field effects. Others were based on new measurements in the LEBT-line performed by the GSI**** Ion Source Group in April 2019. In the near future, further LEBT measurements and subsequent simulations (among other to design a well-fitting cone for the RFQ), as well as mechanical error studies in TOUTATIS, will follow.
*Institute of Applied Physics **Facility for Antiproton and Ion Research ***French Alternative Energies and Atomic Energy Commission ****GSI Helmholtz Centre for Heavy Ion Research |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS032 | |
About • | paper received ※ 14 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPTS033 | RF Measurements and Tuning of the 325 MHz Ladder-RFQ | 925 |
|
||
Funding: BMBF 05P15RFRBA Based on the positive results of the unmodulated 325 MHz Ladder-RFQ prototype from 2013 to 2016, we developed and designed a modulated 3.4 m Ladder-RFQ*. The unmodulated Ladder-RFQ features a very constant voltage along the axis. It accepted 3 times the operating power of which is needed in operation**. That level corresponds to a Kilpatrick factor of 3.1 with a pulse length of 200 µs. The 325 MHz RFQ is designed to accelerate protons from 95 keV to 3.0 MeV according to the design parameters of the proton linac within the FAIR project. This particular high frequency for a 4-ROD-RFQ creates difficulties, which triggered the development of a Ladder-RFQ with its high symmetry. The results of the unmodulated prototype have shown, that the Ladder-RFQ is very well suited for that frequency. The duty cycle is up to 5% for the applied cooling concept. Manufacturing has been completed in September 2018. We will show the finalization of assembly after manufacturing as well as low level RF measurements. The final machining step for both flatness and frequency tuning has been finished in April 2019. *Journal of Physics: Conf. Series 874 (2017) 012048 **Proceedings of LINAC2016, East Lansing, TUPLR053 |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS033 | |
About • | paper received ※ 01 May 2019 paper accepted ※ 17 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |