Author: Hessler, C.     [Heßler, C.]
Paper Title Page
MOPGW024 Measurements of the GSI Transfer Beam Lines Ion Optics 131
 
  • M. Sapinski, O. Geithner, S. Reimann, P. Schütt, M. Vossberg, B. Walasek-Höhne
    GSI, Darmstadt, Germany
  • C. Heßler
    CERN, Meyrin, Switzerland
 
  GSI High Energy Beam Transfer lines (HEST) link the SIS18 synchrotron with two storage rings (Experimental Storage Ring and Cryring) and six experimental caves. The recent upgrades to HEST beam instrumentation enables precise measurements of beam properties along the lines and allow for faster and more precise beams setup on targets. Preliminary results of some of the measurements performed during runs in 2018 and 2019 are presented here. The focus is on response matrix measurements and quadrupole scans performed on HADES beam line. The errors and future improvements are discussed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPGW024  
About • paper received ※ 15 May 2019       paper accepted ※ 19 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMP027 Update on Beam Transfer Line Design for the SPS Beam Dump Facility 2375
 
  • Y. Dutheil, J. Bauche, L.A. Dougherty, M.A. Fraser, B. Goddard, C. Heßler, V. Kain, J. Kurdej, J.A. Uythoven, F.M. Velotti
    CERN, Meyrin, Switzerland
 
  The SPS Beam Dump Facility (BDF) being studied as part of the Physics Beyond Colliders (PBC) CERN project has recently reached an important milestone with the completion of the comprehensive feasibility study. The BDF is a proposed fixed target facility to be installed in the SPS North Area, to accommodate experiments such as SHiP (Search for Hidden Particles), which is most notably aiming at studying hidden sector particles. This experiment requires a high intensity slowly extracted 400 GeV proton beam with 4·1013 protons per 1 s spill to achieve 4·1019 protons on target per year. The extraction and transport scheme will make use of the first 600 m of the existing North Area extraction line. This contribution presents the status of the design work of the new transfer line and discusses the challenges identified. Aperture studies and failure scenarios are treated and the results discussed. In particular, interlock systems aiming at protecting critical components against the uncontrolled loss of the high energy proton beam are considered. We also present the latest results and implications of the design of a new laminated Lambertson splitter magnet to provide fast switching between the current North Area experiments and the BDF.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPMP027  
About • paper received ※ 13 May 2019       paper accepted ※ 20 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMP031 SPS Slow Extraction Losses and Activation: Update on Recent Improvements 2391
 
  • M.A. Fraser, B. Balhan, H. Bartosik, J. Bernhard, C. Bertone, D. Björkman, J.C.C.M. Borburgh, M. Brugger, N. Charitonidis, N. Conan, K. Cornelis, Y. Dutheil, L.S. Esposito, R. Garcia Alia, L. Gatignon, C.M. Genton, B. Goddard, C. Heßler, Y. Kadi, V. Kain, A. Mereghetti, M. Pari, M. Patecki, J. Prieto, S. Redaelli, F. Roncarolo, R. Rossi, W. Scandale, N. Solieri, J. Spanggaard, O. Stein, L.S. Stoel, F.M. Velotti, H. Vincke
    CERN, Meyrin, Switzerland
  • D. Barna, K. Brunner
    Wigner Research Centre for Physics, Institute for Particle and Nuclear Physics, Budapest, Hungary
 
  Annual high intensity requests of over 1019 protons on target (POT) from the CERN Super Proton Synchrotron (SPS) Fixed Target (FT) physics program continue, with the prospect of requests for even higher, unprecedented levels in the coming decade. A concerted and multifaceted R&D effort has been launched to understand and reduce the slow extraction induced radioactivation of the SPS and to anticipate future experimental proposals, such as SHiP* at the SPS Beam Dump Facility (BDF)**, which will request an additional 4·1019 POT per year. In this contribution, we report on operational improvements and recent advances that have been made to significantly reduce the slow extraction losses, by up to a factor of 3, with the deployment of new extraction concepts, including passive and active (thin, bent crystal) diffusers and extraction on the third-integer resonance with octupoles. In light of the successful tests of the prototype extraction loss reduction schemes, an outlook and implications for future SPS FT operation will be presented.
* A. Golutvin et al., Rep. CERN-SPSC-2015-016 (SPSC-P-350), CERN, Geneva, Switzerland, Apr. 2015.
** M. Lamont et al., Rep. CERN-PBC-REPORT-2018-001, CERN, Geneva, Switzerland, 11 Dec 2018.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPMP031  
About • paper received ※ 14 May 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPGW054 Generation and Delivery of an Ultraviolet Laser Beam for the RF-Photoinjector of the Awake Electron Beam 3709
 
  • V. Fedosseev, F. Batsch, C. Capelli, E. Chevallay, N. Chritin, S. Döbert, T. Feniet, F. Friebel, P. Gander, E. Granados, E. Gschwendtner, J. Hansen, C. Heßler, H. Panuganti, K.A. Szczurek
    CERN, Meyrin, Switzerland
  • M. Hüther, M. Martyanov, J.T. Moody, P. Muggli
    MPI-P, München, Germany
 
  In the AWAKE experiment, the electron beam is used to probe the proton-driven wakefield acceleration in a 10 m long rubidium vapor source. Electron bunches are produced using an RF-gun equipped with a Cs2Te photocathode illuminated by an ultraviolet (UV) laser pulse. To generate the UV laser beam a fraction of the infrared (IR) laser beam used for ionization of rubidium is extracted from the laser system, time-compressed to a picosecond scale and frequency tripled using nonlinear crystals. The transport line of the laser beam over the 20 m distance was built using rigid supports for mirrors and air-evacuated tube to prevent any possible beam pointing instabilities due to vibrations and air convection. Construction of the UV beam optical system enables appropriate beam shaping and control of its size and position on the cathode, as well as time delay with respect to the IR pulse, i.e. with respect to the plasma wakefield seeder. In this paper, we present the design of the UV beam line and results of its commissioning regarding IR/UV conversion, beam pointing stability, and means of beam control and monitoring.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPGW054  
About • paper received ※ 14 May 2019       paper accepted ※ 18 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)