Author: Gerhard, P.
Paper Title Page
MOPTS020 Status of the FAIR Proton LINAC 889
 
  • C.M. Kleffner, S. Appel, R. Berezov, J. Fils, P. Forck, P. Gerhard, M. Kaiser, K. Knie, A. Krämer, C. Mühle, S. Puetz, A. Schnase, G. Schreiber, A. Seibel, T. Sieber, V. Srinivasan, J. Trüller, W. Vinzenz, M. Vossberg, C. Will
    GSI, Darmstadt, Germany
  • H. Hähnel, U. Ratzinger, M. Schuett, M. Syha
    IAP, Frankfurt am Main, Germany
 
  For the production of Antiproton beams with sufficient intensities, a dedicated high-intensity 325 MHz Proton linac is currently under construction. The Proton linac shall deliver a beam current of up to 70 mA with an energy of 68 MeV for injection into SIS18. The source is designed for the generation of 100 mA beams. The Low-Energy Beam Transport line (LEBT) contains two magnetic solenoid lenses enclosing a diagnostics chamber, a beam chopper and a beam conus. A ladder 4-Rod RFQ and six normal conducting crossbar cavities of CCH and CH type arranged in two sections accelerate the beam to the final energy of 68 MeV. The technical design of the DTL CH cavities are presented and the commissioning measurements of the ion source are described. The construction and the procurement progress, the design and testing results of the key hardware are presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS020  
About • paper received ※ 14 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPTS036 RFQ Electrodes Change and Upgrade Option at the UNILAC HSI Injector 936
 
  • M. Vossberg, P. Gerhard, L. Groening, S. Mickat, H. Vormann, C. Xiao
    GSI, Darmstadt, Germany
  • V. Bencini, J.M. Garland, J.-B. Lallement, A.M. Lombardi
    CERN, Meyrin, Switzerland
 
  In order to meet the beam intensity and quality requirements imposed by FAIR, the HSI-RFQ beam dynamics originally dating from 2009 has been re-designed recently at CERN. Front-to-end simulations demonstrated that the new design meets the FAIR targets. Implementation of the new electrodes, initially planned for 2019, will require re-adaption of the RFQ cavity rf-parameters by re-shaping the stems that keep the electrodes. However, during the beam time 2018 the existing RFQ did not reach its nominal voltage most likely due to expired lifetime of the electrodes originating from 2009. In order to shorten the RFQ maintenance period and to minimize any risk for upcoming beam time 2019, it was decided to post-pone the implementation of the new design and rather just re-producing the 2009 design electrodes. This contribution is on the re-production process as short-term solution and on the full implementation of the new design as mid-term solution. CST simulations performed at GSI assure that the resonance frequency with the new electrode geometry is recuperated through corrections of the carrier rings. The status of the exchange of the electrodes and simulations for the adaptation of the new electrode design are presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS036  
About • paper received ※ 13 May 2019       paper accepted ※ 17 May 2019       issue date ※ 21 June 2019  