Paper |
Title |
Page |
MOPVA038 |
Manufacturing Status of the IFMIF LIPAc SRF Linac |
939 |
|
- N. Bazin, P. Carbonnier, P. Contrepois, J. Plouin, B. Renard
CEA/DSM/IRFU, France
- C. Boulch, A. Bruniquel, J.K. Chambrillon, G. Devanz, P. Hardy, H. Jenhani, N. N'Doye, O. Piquet, A. Riquelme, D. Roudier
CEA/DRF/IRFU, Gif-sur-Yvette, France
- P. Charon, S. Chel, G. Disset, J. Relland
CEA/IRFU, Gif-sur-Yvette, France
- D. Regidor, F. Toral
CIEMAT, Madrid, Spain
|
|
|
This paper gives the fabrication status of the IFMIF cryomodule. This cryomodule will be part of the Linear IFMIF Prototype Accelerator (LIPAc) whose construction is ongoing at Rokkasho, Japan. It is a full scale of one of the IFMIF accelerator, from the injector to the first cryomodule. The cryomodule contains all the necessary equipment to transport and accelerate a 125 mA deuteron beam from an input energy of 5 MeV up to the output energy of 9 MeV. It consists of a horizontal vacuum tank of around 6 m long, 3 m high and 2.0 m wide, which includes 8 superconducting HWRs for beam acceleration, working at 175 MHz and at 4.45 K, 8 Power Couplers to provide RF power to cavities up to 70 kW CW in LIPAc case and 200 kW CW in IFMIF case, and 8 Solenoid Packages as focusing elements.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-MOPVA038
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPVA043 |
Assembly Preparation of the IFMIF SRF Cryomodule |
954 |
|
- J.K. Chambrillon, N. N'Doye
CEA/DRF/IRFU, Gif-sur-Yvette, France
- N. Bazin, P. Charon, G. Devanz, P. Hardy, O. Piquet, J. Plouin
CEA/IRFU, Gif-sur-Yvette, France
- P. Contrepois, C. Servouin
CEA/DSM/IRFU, France
|
|
|
This article presents the preparation work performed by CEA for the assembly of the IFMIF Cryomodule. Before the shipping of the components to Japan many tests and trial assemblies has been realized on the CEA site of Saclay, France. The cryomodule, which is part of the Linear IFMIF Prototype Accelerator (LIPAc) under construction at Rokkasho in Japan, will be assembled there under the responsibility of F4E (Fusion for Energy) with CEA assistance. To fulfill the assembly of the cavity string, a cleanroom will be built at Rokkasho under the responsibility of QST.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-MOPVA043
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|