THPVA125 Status of Commissioning of Gantry 3 at the PSI PROSCAN Facility 4744
 
  • A. Koschik, J.P. Duppich, M. Eichin, P. Fernandez Carmona, A. Gerbershagen, A.L. Lomax, D. Meer, S. Safai, J.M. Schippers, D.C. Weber
    PSI, Villigen PSI, Switzerland
 
  Paul Scherrer Institute currently extends its PROSCAN facility with a third gantry treatment room - Gantry 3, which is realized in a research collaboration with Varian Medical Systems. The main research goals at the PROSCAN facility include further development of precise spot scanning and optimized beam delivery with low dead-time for treatment of moving targets. Consequently Gantry 3 is designed to feature advanced pencil beam scanning technology with a large scan field size of 30x40cm, integrated cone beam CT functionality and will in the future allow fast energy layer switching. The main challenge in realizing Gantry 3 is the integration of the Varian Gantry into the existing PROSCAN control system environment, allowing seamless beam operation. Installation of the additional treatment room has started in summer 2015 followed by the integration and technical commissioning phases of the Gantry in 2016, all during full operation of the existing treatment areas at our facility. We report about the special challenges and achieved performance results during commissioning of the Varian Gantry system in combination with the PSI PROSCAN facility.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-THPVA125  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)