Paper |
Title |
Page |
MOPAB119 |
Beam Instrumentation Developments for the Advanced Proton Driven Plasma Wakefield Acceleration Experiment at CERN |
404 |
|
- S. Mazzoni, M. Barros Marin, B. Biskup, A. Boccardi, T.B. Bogey, S. Burger, F.S. Domingues Sousa, E. Effinger, J. Emery, A. Goldblatt, I. Gorgisyan, E. Gschwendtner, A. Guerrero, L.K. Jensen, T. Lefèvre, D. Medina, B. Moser, G. Schneider, L. Søby, M. Turner, M. Vicente Romero, M. Wendt
CERN, Geneva, Switzerland
- B. Biskup
Czech Technical University, Prague 6, Czech Republic
- M. Turner
TUG/ITP, Graz, Austria
- V.A. Verzilov
TRIUMF, Vancouver, Canada
|
|
|
The Advanced Proton Driven Plasma Wakefield Acceleration Experiment (AWAKE) at CERN aims to develop a proof-of-principle electron accelerator based on proton driven plasma wake-field acceleration. The core of AWAKE is a 10 metre long plasma cell filled with Rubidium vapour in which single, 400 GeV, proton bunches extracted from the CERN Super Proton Synchrotron (SPS) generate a strong plasma wakefield. The plasma is seeded using a femtosecond pulsed Ti:Sapphire laser. The aim of the experiment is to inject low energy electrons onto the plasma wake and accelerate them over this short distance to an energy of several GeV. To achieve its commissioning goals, AWAKE requires the precise measurement of the position and transverse profile of the laser, proton and electron beams as well as their temporal synchronisation. This contribution will present the beam instrumentation systems designed for AWAKE and their performance during the 2016 proton beam commissioning period.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-MOPAB119
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPAB121 |
Installation and Test of Pre-series Wire Scanners for the LHC Injector Upgrade Project at CERN |
412 |
|
- R. Veness, P. Andersson, W. Andreazza, N. Chritin, B. Dehning, J. Emery, A. Goldblatt, D. Gudkov, F. Roncarolo, J.L. Sirvent, J. Tassan-Viol
CERN, Geneva, Switzerland
|
|
|
A new generation of fast wire scanners is being developed for the LHC Injectors Upgrade (LIU) project at CERN. These will be essential tools for transverse profile measurement with the higher brightness LIU beams, and are planned for installation in 2019 in all three synchrotrons making up the LHC injector chain. An active period of development and test has resulted in prototype installations in the SPS and PSB rings. This paper will summarise the design and report on the results to-date.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-MOPAB121
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|