Paper |
Title |
Page |
TUPIK068 |
Parameters Calibration and Compensation-Rematch of Failure Cavities in CADS Injector |
1852 |
SUSPSIK085 |
|
|
- Y.Z. Jia, W.L. Chen, W.P. Dou, P.H. Gao, H. Jia, S.H. Liu, Y.S. Qin, C. Wang, W.S. Wang, Z.J. Wang
IMP/CAS, Lanzhou, People's Republic of China
|
|
|
Now when a failure on the China Accelerator Driven System (CADS) is detected, the beam will be stopped by the machine protection system (MPS) immediately. But because of the demand of the beam trip (more than 5 min) rate which should be less than 50 times per year [1], it is important to avoid cutting beam down or recover the beam in a short time. The compensation and rematch is of great importance. If the failure is on a cavity, the other cavities should retune to compensate the beam energy, position and phase in order to recover the beam in short time depending on the time of online calculation.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-TUPIK068
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|