Manufacturing Status of the IFMIF LIPAc SRF Linac |
939 |
|
- N. Bazin, P. Carbonnier, P. Contrepois, J. Plouin, B. Renard
CEA/DSM/IRFU, France
- C. Boulch, A. Bruniquel, J.K. Chambrillon, G. Devanz, P. Hardy, H. Jenhani, N. N'Doye, O. Piquet, A. Riquelme, D. Roudier
CEA/DRF/IRFU, Gif-sur-Yvette, France
- P. Charon, S. Chel, G. Disset, J. Relland
CEA/IRFU, Gif-sur-Yvette, France
- D. Regidor, F. Toral
CIEMAT, Madrid, Spain
|
|
|
This paper gives the fabrication status of the IFMIF cryomodule. This cryomodule will be part of the Linear IFMIF Prototype Accelerator (LIPAc) whose construction is ongoing at Rokkasho, Japan. It is a full scale of one of the IFMIF accelerator, from the injector to the first cryomodule. The cryomodule contains all the necessary equipment to transport and accelerate a 125 mA deuteron beam from an input energy of 5 MeV up to the output energy of 9 MeV. It consists of a horizontal vacuum tank of around 6 m long, 3 m high and 2.0 m wide, which includes 8 superconducting HWRs for beam acceleration, working at 175 MHz and at 4.45 K, 8 Power Couplers to provide RF power to cavities up to 70 kW CW in LIPAc case and 200 kW CW in IFMIF case, and 8 Solenoid Packages as focusing elements.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-MOPVA038
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPVA040 |
Status of the ESS Elliptical Cryomodules at CEA Saclay |
945 |
|
- P. Bosland, C. Arcambal, F. Ardellier, S. Berry, A. Bouygues, A. Bruniquel, E. Cenni, J.-P. Charrier, C. Cloué, G. Devanz, F. Éozénou, T. Hamelin, X. Hanus, P. Hardy, C. Marchand, O. Piquet, J. Plouin, J.P. Poupeau, T. Trublet
CEA/DRF/IRFU, Gif-sur-Yvette, France
- G. Costanza
Lund University, Lund, Sweden
- C. Darve
ESS, Lund, Sweden
- P. Michelato
INFN/LASA, Segrate (MI), Italy
- G. Olivier
IPN, Orsay, France
- F. Peauger
CEA/DSM/IRFU, France
|
|
|
The first ESS prototype cryomodule with medium beta cavities named M-ECCTD is being assembled at CEA Saclay. The Q curves of the 4 cavities mounted inside the cryomodule are presented, and the four power couplers have been conditioned at high power before their assembly onto the cavity string. Completion of the M-ECCTD assembly outside clean room is in progress as well as the finalization of the RF power test stand preparation. RF power tests of the M-ECCTD will be performed during summer 2017. CEA is preparing the production of the ESS medium and high beta cryomodules of the series before the test of the M-ECCTD and the contracts for the procurement of the most critical components have already been signed
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-MOPVA040
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPVA044 |
Conditioning of the Power Couplers for the ESS Elliptical Cavity Prototypes |
957 |
|
- C. Arcambal, P. Carbonnier, M. Desmons, G. Devanz, T. Hamelin, C. Marchand, C. Servouin
CEA/DRF/IRFU, Gif-sur-Yvette, France
- C. Darve
ESS, Lund, Sweden
|
|
|
In the framework of the European Spallation Source (ESS), some power couplers have been designed and manufactured to supply, with RF power, the medium-beta (β=0.67) elliptical cavities of the cryomodule demonstrator. The power couplers work at 704.4 MHz and are tested up to 1.2 MW (repetition rate=14 Hz, RF pulse width close to 3.6 milliseconds). The CEA Saclay is in charge of the design, the manufacturing, the preparation and the conditioning of these power couplers. In this paper, after a general presentation of the power couplers used in the ESS LINAC and their characteristics, we give some détails about the manufacturing and then we describe the different steps of the preparation (cleaning), the assembly of the couplers on the coupling box in cleanroom, the baking of the couplers and the conditioning procedure. Finally, the experimental results obtained in travelling and standing waves on the first pairs of couplers will be shown.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-MOPVA044
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THOBB3 |
ESS SRF Linear Accelerator Components Preliminary Results and Integration |
3666 |
|
- C. Darve, N. Elias, C.G. Maiano, F. Schlander
ESS, Lund, Sweden
- C. Arcambal, G. Devanz, F. Peauger
CEA/DRF/IRFU, Gif-sur-Yvette, France
- E. Cenni
CEA/IRFU, Gif-sur-Yvette, France
- G. Costanza
Lund University, Lund, Sweden
- P. Duthil, G. Olry, D. Reynet
IPN, Orsay, France
- L. Hermansson
Uppsala University, Uppsala, Sweden
- P. Michelato, D. Sertore
INFN/LASA, Segrate (MI), Italy
|
|
|
The European Spallation Source (ESS) is a pan-European project and one of world's largest research infrastructures based on neutron sources. This collaborative project is funded by a collaboration of 17 European countries and is under construction in Lund, Sweden. The 5 MW, 2.86 ms long pulse proton accelerator has a repetition frequency of 14 Hz (4 % duty cycle), and a beam current of 62.5 mA. The Superconducting Radio-Frequency (SRF) linac is composed of three families of Superconducting Radio-Frequency (SRF) cavities, which are being prototyped, counting the spoke resonators with a geometric beta of 0.5, medium-beta elliptical cavities (betag=0.67) and high-beta elliptical cavities (betag=0.86). After a description of the ESS linear accelerator layout, this article will focus on the recent progress towards integration of the first test results of the main critical components to be assembled in cryomodules, then in the ESS tunnel.
|
|
|
Slides THOBB3 [25.611 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-THOBB3
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPVA039 |
Manufacturing and Validation Tests of IFMIF Low-Beta HWRs |
942 |
|
- G. Devanz, F. Éozénou, L. Maurice, P. Sahuquet, C. Servouin
CEA/DSM/IRFU, France
- N. Bazin, P. Carbonnier, P. Charon, G. Disset, P. Hardy, E. Jacques, O. Piquet, D. Roudier
CEA/IRFU, Gif-sur-Yvette, France
- J.K. Chambrillon, T. Percerou
CEA/DRF/IRFU, Gif-sur-Yvette, France
|
|
|
The IFMIF accelerator aims to provide an accelerator-based D-Li neutron source to produce high intensity high energy neutron flux to test samples as possible candidate materials to a full lifetime of fusion energy reactors. A prototype of the low energy part of the accelerator is under construction at Rokkasho in Japan. It includes one cryomodule containing 8 half-wave resonators (HWR) operating at 175 MHz .The first manufactured HWR has passed low power tests at 4.2K in vertical cryostat succesfully and exceeds the specifications. It has also been tested in the dedicated horizontal Sathori cryostat equiped with its cold tuning system. The serial production and qualification tests of the 8 cavities which will eventually equip the cryomodule are carried out in parallel. In this paper, we focus on the HWR preparation and test results and give a status of the manufacturing activities.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-MOPVA039
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPVA041 |
Vertical Test Results on ESS Medium and High Beta Elliptical Cavity Prototypes Equipped with Helium Tank |
948 |
|
- E. Cenni
CEA/IRFU, Gif-sur-Yvette, France
- P. Bosland, G. Devanz, F. Éozénou, X. Hanus, L. Maurice, F. Peauger, J. Plouin, D. Roudier, C. Servouin
CEA/DSM/IRFU, France
- G. Costanza
Lund University, Lund, Sweden
- C. Darve
ESS, Lund, Sweden
|
|
|
The ESS elliptical superconducting Linac consists of two types of 704.42 MHz cavities, medium and high beta, to accelerate the beam from 216 MeV (spoke cavity Linac) up to the final energy at 2 GeV. The last Linac optimization, called Optimus+, has been carried out taking into account the limitations of SRF cavity performance (field emission). The medium and high-beta parts of the Linac are composed of 36 and 84 elliptical cavities, with geometrical beta values of 0.67 and 0.86 respectively. This work presents the latest vertical test results on ESS medium and high beta elliptical cavity prototypes equipped with helium tank. We describe the cavity preparation procedure from buffer chemical polishing to vertical test.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-MOPVA041
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPVA043 |
Assembly Preparation of the IFMIF SRF Cryomodule |
954 |
|
- J.K. Chambrillon, N. N'Doye
CEA/DRF/IRFU, Gif-sur-Yvette, France
- N. Bazin, P. Charon, G. Devanz, P. Hardy, O. Piquet, J. Plouin
CEA/IRFU, Gif-sur-Yvette, France
- P. Contrepois, C. Servouin
CEA/DSM/IRFU, France
|
|
|
This article presents the preparation work performed by CEA for the assembly of the IFMIF Cryomodule. Before the shipping of the components to Japan many tests and trial assemblies has been realized on the CEA site of Saclay, France. The cryomodule, which is part of the Linear IFMIF Prototype Accelerator (LIPAc) under construction at Rokkasho in Japan, will be assembled there under the responsibility of F4E (Fusion for Energy) with CEA assistance. To fulfill the assembly of the cavity string, a cleanroom will be built at Rokkasho under the responsibility of QST.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-MOPVA043
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|