Author: Al-Dmour, E.
Paper Title Page
WEPAB068 Residual Gas in the Vacuum System of the Solaris 1.5GeV Electron Storage Ring 2734
 
  • A.M. Marendziak, S. Piela, M.J. Stankiewicz, A.I. Wawrzyniak, M. Zając
    Solaris National Synchrotron Radiation Centre, Jagiellonian University, Kraków, Poland
  • E. Al-Dmour
    MAX IV Laboratory, Lund University, Lund, Sweden
 
  Solaris is a third generation light source constructed at the Jagiellonian University in Kraków, Poland. The machine was designed by the MAX IV Laboratory team. The replica of the 1.5 GeV storage ring with 96 m circumference of a vacuum system was successfully built and now the synchrotron facility is after the 3rd phase of commissioning. Recent installation of the Residual Gas Analyzer (RGA) in the storage ring allows now for evaluation of the residual gas composition. Within this paper the result of residual gas analysis in the vacuum system of storage ring during different states of the machine will be presented. Result of vacuum performance regarding beam cleaning and beam lifetime will be presented. Moreover, the NEG strips performance will be evaluated and reported.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-WEPAB068  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPVA090 The Vacuum System of MAX IV Storage Rings: Installation and Conditioning 3468
 
  • E. Al-Dmour, M.J. Grabski
    MAX IV Laboratory, Lund University, Lund, Sweden
 
  The installation of the vacuum system of the 3 GeV storage ring was started in November 2014 and finished in May 2015. In August 2015 the commissioning of the storage ring started, the first stored beam has been achieved on the 15th of September 2015. The installation of the vacuum system of the 1.5 GeV storage ring was done from September 2015 and the main part finished in December 2015, the connection to the Linac with the transfer line has been done in August 2016. In September 2016 the commissioning of the 1.5 GeV storage ring started with the first stored beam achieved on the 30th of September 2016. The vacuum system conditioning for the two rings was successful; the average dynamic pressure reduction and the increase in the lifetime with the accumulated beam dose is a demonstration of the good performance of the vacuum system. The installation procedure and the results of the conditioning together with the latest developments are introduced here.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-WEPVA090  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)