Author: Wallon, S.
Paper Title Page
THOAA02 The Development of C-Band Cavity Beam Position Monitor with a Position Resolution of Nano Meter 3149
 
  • S.W. Jang, E.-S. Kim
    Korea University Sejong Campus, Sejong, Republic of Korea
  • P. Bambade, O.R. Blanco-García, S. Wallon
    LAL, Orsay, France
  • N. Blaskovic Kraljevic, T. Bromwich, P. Burrows
    JAI, Oxford, United Kingdom
  • T. Tauchi, N. Terunuma
    KEK, Ibaraki, Japan
 
  We developed and tested an C-band beam position monitor with position resolution of nano meter in ATF2. The C-band BPM was developed for the fast beam feedback system at the interaction point of ATF in KEK, which C-band beam position monitor called to IPBPM (Interaction Point Beam Position Monitor). The developed IPBPM was measured 26nm with 30% of nominal beam charge of ATF. From the measured beam position resolution, we can expected to 8nm beam position resolution with nominal ATF beam charge condition. In this talk, we will described about the development of IPBPM and the beam test results of nano meter level beam position resolution.  
slides icon Slides THOAA02 [4.806 MB]  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THOAA02  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPOR030 Commissioning and First Performance Studies of a Single Vertical Beam Halo Collimation System at ATF2 3844
 
  • N. Fuster-Martínez, A. Faus-Golfe
    IFIC, Valencia, Spain
  • P. Bambade, A. Faus-Golfe, S. Wallon, R.J. Yang
    LAL, Orsay, France
  • K. Kubo, T. Okugi, T. Tauchi, N. Terunuma
    KEK, Ibaraki, Japan
  • I. Podadera, F. Toral
    CIEMAT, Madrid, Spain
  • T. Tauchi, N. Terunuma
    Sokendai, Ibaraki, Japan
 
  A single vertical beam halo collimation system has been installed in the ATF2 beamline to reduce the background that could limit the precision of the diagnostics located in the post-IP beamline. On this paper the commissioning and first performance studies of a single vertical beam halo collimation system are reported. Furthermore realistic efficiency studies have been done using the simulation code BDSIM and compared with the first experimental tests.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THPOR030  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)